Table of Contents
Chapter 1 – Safety Instructions ________________________________________________ 1-1
Introduction ____________________________________________________________________ 1-1
Installation Safety Notices _________________________________________________________ 1-1
Operation Safety Notices __________________________________________________________ 1-2
Chapter 2 – Installation ______________________________________________________ 2-1
Uncrating _______________________________________________________________________ 2-1
Preparation For Use ______________________________________________________________ 2-1
Installation Location _____________________________________________________________ 2-2
Humidity Water Connection _______________________________________________________ 2-3
Plumbed Demineralized Water Installation __________________________________________________ 2-3
Water Recirculation System Installation, Model W100 _________________________________________ 2-3
Water Recirculation System Filter Cartridge Replacement ______________________________________ 2-3
Water Recirculation System Assembly, Model W100 __________________________________________ 2-4
Chapter 3 – Operation _______________________________________________________ 3-1
Introduction ____________________________________________________________________ 3-1
Summary of Chamber Operation ___________________________________________________ 3-1
Front Panel Switches and Lights ____________________________________________________ 3-2
POWER Switch________________________________________________________________________ 3-2
Loading the Chamber ____________________________________________________________ 3-4
Performance Considerations ______________________________________________________________ 3-4
Port Plugs ____________________________________________________________________________ 3-5
Avoiding Moisture (non-humidity mode) ____________________________________________________ 3-5
Internal Test Fixtures ___________________________________________________________________ 3-5
Humidity Operation ______________________________________________________________ 3-6
Humidity Mode Enable __________________________________________________________________ 3-6
Standard Humidity Range ________________________________________________________________ 3-6
Humidity Mode Considerations ___________________________________________________________ 3-6
Purge (optional) _________________________________________________________________ 3-7
GN2 (Gaseous Nitrogen) Installation (Option TE-1239) ________________________________________ 3-7
Dry Air Installation (Option TE-0017) ______________________________________________________ 3-7
Purge Operation _______________________________________________________________________ 3-8
Adjusting the Purge Flow ________________________________________________________________ 3-8
Relief Vent ___________________________________________________________________________ 3-8
Event Outputs ___________________________________________________________________ 3-9
Event Assembly (Option TE-1235)_________________________________________________________ 3-9
Chapter 4 - Limit Controller __________________________________________________ 4-1
Introduction ____________________________________________________________________ 4-1
Limit Controller Keys and Displays ________________________________________________________ 4-2
How to Set the High and Low Temperature Safety Limits _______________________________________ 4-2
Resetting an Out of Limit Condition ________________________________________________________ 4-2
Silencing the Audible Alarm ______________________________________________________________ 4-2
Protecting an Energized Test Sample _______________________________________________________ 4-3
Chapter 5 – Frequently Asked Questions ________________________________________ 5-1
Chapter 6 – Specifications ____________________________________________________ 6-1
Chapter 7 – Maintenance _____________________________________________________ 7-1
Preventive Maintenance Intervals __________________________________________________ 7-1
Daily or As Needed _____________________________________________________________________ 7-1
Every 3 Months ________________________________________________________________________ 7-1
Every 6 Months ________________________________________________________________________ 7-1
Every 12 Months _______________________________________________________________________ 7-1
Summary of Contents for 123HS
Page 2: ......
Page 20: ......
Page 24: ......
Page 28: ......
Page 30: ......
Page 48: ......
Page 50: ......
Page 51: ...Chapter 9 Drawings TestEquity 123HS Temperature Humidity Chamber Page 9 1 Chapter 9 Drawings...
Page 52: ......
Page 53: ...Electrical Subpanel Component Location Purge Subpanel optional Main Subpanel...