Machine anchoring sequence is the following:
a. align the machine with the pull as much as possible.
b. anchor the machine using the connections (table 3, pos. 4) and adjusting the tension uniformly: use
suitable anchoring ropes with working load equal to 130% of the max. foreseen pull for the
machine.
c. position the supporting point (table 2, pos. 11).
d. properly position the plough (table 2, pos. 14) by removing the safety pin (table 2, pos. 13),
adjusting the tension by means of the valve (table 1, pos. 28) and acting on the plough control lever
(table 1, pos. 19) (NOTE: this operation has to be effectuated with running engine).
IMPORTANT: before starting stringing operations, we suggest to test the pull, reaching
the max. value expected for these operations, in order to check the carried out
anchoring and the machine settling. It is better to have the rear anchoring slightly
released so that the machine can freely settle.
e. put the anchoring ropes under tension using the suitable turnbuckles (if necessary, anchor the
machine also in the front).
f. block the machine axle acting on the hand-wheel (table 2, pos. 10)
.
ATTENTION:
the non-respect of the foreseen anchoring operations may cause dangerous
situations during machine use.
Around the machine must be a free space of at least 2-m to make easier the operations of use,
adjustment, maintenance, etc.
Be sure that around the radiator (endothermic motor, hydraulic oil) cooling air can freely circulate.
Otherwise overheating situations with damage for the installed components may happen.
DANGER:
machine has not a proper grounding device; for the system machine-rope-
conductor in the job site, it is necessary to foreseen a grounding device on the towing rope or
on the conductors.
Summary of Contents for AFB506
Page 43: ......
Page 45: ......
Page 47: ......
Page 49: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ...PULLER TENSIONER Model AFB506 TABLE 7 1 1 Machine connection cable 2 Machine ground cable ...
Page 55: ......
Page 56: ...PULLER Model AFB506 TABLE 8 1 1 Hydraulic cylinder 2 Connecting block 3 Quick coupler ...
Page 57: ......
Page 61: ......
Page 62: ......
Page 63: ... CD1 2 1 2 C2 14 134 222 cobo 15 32 52 ...
Page 64: ... CD1 CD2 ...
Page 65: ...W21 m m M m u rBM m R W21M ...
Page 66: ...W21 m m M m u rBM m R W21M ...
Page 67: ......
Page 68: ......
Page 69: ......
Page 73: ...W41 5m 1 Murr SCH W42 5m 2 Murr SCH YV4 W43 5m 3 Murr W44 5m 4 Murr ...
Page 74: ...W52 1 5m 2 Murr YV5 W53 5m 4 Murr W52 1 5m 1 Murr W52 1 5m 2 Murr ...
Page 89: ......
Page 90: ......
Page 91: ...W21 m m M m u rBM rB m R W21M W21 m m M m u rBM rB m R W21M ...
Page 92: ......
Page 93: ...120 ABN0 LD0 LD1 LD3 121 LD4 ABN1 ...
Page 94: ...120 ABN0 LD0 LD1 LD3 121 LD4 ABN1 ...
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ......
Page 99: ......
Page 100: ......
Page 101: ......
Page 102: ......
Page 103: ......
Page 104: ......
Page 105: ......
Page 106: ......
Page 107: ......
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ... S3 W27 1 5m 09103445 7 Gn Rd Murr PREWIRED CABLE SINGLE YV2 ...
Page 119: ......
Page 122: ... KCD 11 12 14 61 E7 KCD 21 22 24 61 E7 KCD 21 22 24 61 E7 ...
Page 123: ......
Page 126: ......
Page 128: ......
Page 130: ......
Page 132: ......
Page 134: ...1 2 0 A B 1 2 0 A B ...
Page 139: ......
Page 141: ......
Page 143: ......
Page 144: ......
Page 146: ......
Page 147: ......
Page 148: ......
Page 149: ......
Page 150: ......
Page 151: ......
Page 152: ......
Page 153: ......