46
ENG
Vacuuming (Gas R32)
Exclusive R32 refrigerant pump must be used in making R32 refrigerant vacuum.
Before working on the air conditioner, remove the cover of
the stop valve(gas and liquid valves)and be sure to retighten it
afterward.(to prevent the potential air leakage).
1. To prevent air leakage and spilling tighten all connecting
nut of all flare tubes.
2. Connect the stop valve, charge hose, manifold valve, and
vacuum pump.
3. Fully open the handle Lo of the manifold valve and
apply vacuum for at least 15 minutes and check that the
compound vacuum gauge reads -0.1MPa (-76cmHg).
4. After applying vacuum, fully open the stop valve with a hex
wrench.
5. Check that both indoor and outdoor connections are free
of air leakage.
Compound meter
-76cmHg
Pressure
gauge
Manifold
valve
Handle Hi
Charge
hose
Vacuum
pump
Stop valve
(gas valve)
Stop valve
(liquid valve)
Charge hose
Handle Lo
Outdoor condensation drainage (Heat pump type only)
When the unit is heating, the condensing water and defrosting
water can be out reliably through the drain house.
Installation
:
Install the outdoor drain elbow in
ɸ
25 hole on the base
plate, and joint the drain hose to the elbow, so that the
waste water formed in the outdoor unit can be drained
out to a proper plate.
Chassis
Outdoor drain elbow
CHECK AFTER INSTALLATION AND TEST
OPERATION
Check after installation
Electrical Safety Check
1. If the supply voltage is as required.
2. If there is any faulty or miss connection in each of the power, signal and grounding wires.
3. If the grounding wire of the air conditioner is securely grounded.
Installation Safety Check
1. If the installation is secure.
2. If the water drain is smooth.
3. If the wiring and piping are correctly installed.
4. Check that no foreign matter or tools are left inside the unit.
5. Check the refrigerant pipeline is protected well.
Leak test of the refrigerant
Depending on the installation method, the following methods may be used to check for suspect leak, on areas
such as the four connections of the outdoor unit and the cores of the cut-off valves and t-valves:
1. Bubble method: Apply of spray a uniform layer of soap water over the suspected leak spot and observe carefully
for bubble.
2. lnstrument method: Checking for leak by pointing the probe of the leak detector according to the instruction to
the suspect points of leak.
Note
: Make sure that the ventilation is good before checking.
Summary of Contents for TA22FFUL-07410IA
Page 3: ...3 RUS R32 5 1 7 R32 Notes R32...
Page 4: ...4 RUS 8 1 675 1 675 1 CO2 100...
Page 5: ...5 RUS 3 0 30 1 5 WEEE 43 C Apply to T1 52 C Apply to T3 18 C 24 C 7 C 27 C 1 2 3 3 15 250...
Page 6: ...6 RUS 80 T1 T3 ISO 5151 5 12 1 2 1 2 1 2...
Page 7: ...7 RUS Wi Fi...
Page 8: ...8 RUS 5 40 C 1 2 45 C 1 2 3 4 5 1...
Page 9: ...9 RUS 1 2 3 4 3 5...
Page 10: ...10 RUS...
Page 11: ...11 RUS R32 R32 R32 2 R32 4 200...
Page 13: ...13 RUS 1 1 7 2 1 1 1 2 1 1 1 15cm 20cm 20cm 200 260cm...
Page 14: ...14 RUS 1 2 3 1 5 10 2 60 80 1 1 2 Outlet material preparation 2 1...
Page 15: ...15 RUS 1 2 1 2 3 Nm 6 6 35 15 88 9 9 52 35 40 12 12 7 45 60 15 88 73 78 19 05 75 80 1 2...
Page 16: ...16 RUS 1 2 3...
Page 18: ...18 RUS 1 2 3 4 5...
Page 19: ...19 RUS R32 R32 R32 1 2 3 Lo 15 0 1 76cmHg 4 5 76cmHg 25 1 2 3 1 2 3 4 5...
Page 20: ...20 RUS 1 2 SWING R32 R32 1 2 R32 1 2...
Page 21: ...21 RUS 1 2 3 4 5 6 7...
Page 22: ...22 RUS R32 R32 25 1 2 3 4...
Page 23: ...23 RUS 1 2 3 4 5 6 7 8 80 9 10 11 1 2 3 R32 II 4 5 R32...
Page 24: ...24 RUS 1 2 8 3 4 5 6 7 7 8 9 10 6 R32...
Page 26: ...26 RUS 1 2 AUTO COOL DRY HEAT FAN 3 Low Mid High Auto 4 5 H on off 0 5 24 H on off...
Page 55: ......
Page 56: ...www tesla info...