
iii
In this manual…
Chapter 1
General Information,
page 1-1
Gives a general test cell description and how to proceed with set-up procedures.
Chapter 2
Installation and Configuration,
page 2-1
Describes Shield Box configuration and installation procedures.
Chapter 3
TC-5942B Verification,
page 3-
1
Provides test cell performance verification procedures and test cell operating example
programs.
Chapter 4
TC-5942B Options,
page 4-1
Provides information on the TC-5942B options including DUT Handler
Chapter 5
Maintenance of TC-5942B,
page 5-1
Describes shield box maintenance items and procedures.
Appendix A
TC-5942B Specification,
page A-1
Gives the shield box specification
Appendix B
TC-5942B I/O Interface Block Diagram,
page B-1
Gives the shield box I/O interface information
Appendix C
TC-5942B Operation Flow Chart for programming,
page C-1
Gives the operation flow chart for programming