11
WARNING :
-
CHECK BOTH OF THE BATTERY GROUPS FOR CORRECT POLARITY AND VOLTAGE
-
DO NOT TURN ON THE BATTERY SWITCH (F5) BEFORE STARTING THE UPS
5. Connect the copper earth bus, to the safety earth of the mains distribution panel.
NOTE :
The earth and the neutral connections must be in accordance with the local rules.
WARNING: Note that the Input Neutral (N1) MUST also be connected to K10 terminal
2.6.1 UPS Power Cable Connection Terminals :
Figure 2.2
100-120-160 kVA POWER Cable Connection
Summary of Contents for DS300 Series
Page 1: ...DS300 SERIES DSP Controlled UPS 100 120 160 kVA 3 Phase In 3 Phase Out USER MANUAL...
Page 2: ......
Page 53: ......
Page 54: ...AGKK10632 09 2021...