Teryair 6VMD Series Operation And Maintenance Manual Download Page 5

FF-MM-370-REV - 01

Page 5

Operation and Maintenance Guide  6 VM Air Motor Series

    Warning

Check the site to make sure that the Vane   

motor will be adequately ventilated and that 

there is no external heat input.

Caution

Completely turn off the Vane motor and 

disconnect air supply line before attempting 

any service. Read Assembly and Dis-assembly 

instructions.

Warning

Do not use a hammer on the shaft or  

connections.
Do Not dis-assemble in explosive atmosphere.

Warning

Take care not to exceed the supply air pressure 

maximum  7kg/cm²(100 psi) for Lubricated 

and maximum  5.6 kg/cm²(80 psi) for Lube-

free .

Caution

Do not exert excessive pressure against the 

work surface. Keep hoses in good condition. 

Check hoses for signs of wear, cracks & bulges 

and ensure that they are secure. Accidental 

disconnection while hose is pressurized makes 

the hose whip and can be a safety hazard.

Caution

•  Please check the hose connection prior to 

starting motor

•  Keep hands & clothing away from  

moving parts.

•  Store these Vane motors in secure & dry 

environment.

•  Do not modify this Vane motor in any way 

as this will invalidate the warranty and 

could lead to serious injury.

•  Do not drag this Vane motor by air hose.

    Installation Instructions

An automatic air line lubricator should be in-

stalled in the air line as close as possible and no 

more than 18inches (1/2 meter) from the   air 

motor. Install the lubricator level with or above 

the air motor so that the oil mist will blow  direct-

ly into or fall down into the motor. Install a  ilter 

in the air line before the connection to the motor. 

Next install an air pressure regulator to control 

motor speed and torque.

Clean the compressed air connection with low 

pressure air to remove any dirt from the line  

before connecting to the ports. Use the proper 

sized fasteners. For the most efficient output and 

control of speed, use air lines that are the same 

size as the motor inlet port if the connection is 

less than 7 feet (2 meters). For longer connec-

tions, use the next pipe size larger than the motor 

intake port. Connect lines to motor in the proper 

direction

Safety wear mandatory while operating Vane  

motor 
Air stream from product may contain solid o   

liquid particle that can result eye or skin dam  

age.Eye and face and ear protection must be   

worn at all times during operation
Suitable gloves must be worn at all times during 

operation.
Operators must wear helmets of suitable         

strength at all times. Helmet must be able to   

withstand 10G in 8ms without fracturing.
 Waterproof heavy duty outerwear and Shoes   

 

with toe cap protection are a must during             

operation

should not exceed  80º C. Do not continue 

to operate the motor if the measured sur-

face temperature exceeds temperature listed 

on the motor. If your measured temperature 

does exceed listed value, consult with your 

Distributor / Representative for a recom-

mendation.

Summary of Contents for 6VMD Series

Page 1: ...VMNXXX NEMA Model with Lube Lube Free SG Iron SS NPT BSPT Variants 6VMDXXX IEC Model with Lube Lube Free SG Iron SS NPT BSPT Variants 6 V M Read this manual carefully before installing operating or se...

Page 2: ...tructions 6 Operating instructions 7 Suggested Lubricants 7 Troubleshooting 8 Dis assembly and Re assembly 9 Exploded View for 6VM Air Motor 10 Bill of Materials for 6VM Series SG Iron 11 Bill of Mate...

Page 3: ...12 Nm 105 lbs in Air Consumption 0 to 240 m3 hr 0 to 140 cfm Motor Weight 7 5 kgs 16 5 lbs Operating Pressure 1 4 to 7kg cm2 20 to 100PSI Max Allowable speed 3500 rpm ATEX limit 500 2500 2000 1000 15...

Page 4: ...or on the casting opposite the pipe ports The maximum surface temperature listed on the motor is for nor mal environmental and installation conditions Fort air motors Temp Class T6 Gas and T85 C Dust...

Page 5: ...inches 1 2 meter from the air motor Install the lubricator level with or above the air motor so that the oil mist will blow direct ly into or fall down into the motor Install a ilter in the air line b...

Page 6: ...e Check the direction of the motor airflow A single rotation motor will operate properly only in one direction Single rotation motors require a muffler to be connected to the air port Remove the plast...

Page 7: ...or serviced Air source inadequate Inspect and repair Air source too far from motor Reconfigure setup Suggested Lubricants Brand Above 27 Deg C From 5 Deg C to 27 Deg C Below 5 Deg C Shell Toona R 72 T...

Page 8: ...e To remove the Front Bearing Cap 6 from Front Flange 2 unscrew CSK Bolt 21 from it The O ring 9 and Oil Seal 10 can be now removed from Front Bearing Cap 6 Replace with new ones if found damaged f N...

Page 9: ...REV 01 Page 9 Operation and Maintenance Guide 6 VM Air Motor Series Exploded View for 6VM Air Motor 1 13 17 4 3 7 9 5 19 11 14 18 24 23 16 20 15 12 2 6 9 10 21 FOOT FACE 25 7 18 14 22 10 8 2 IEC NEMA...

Page 10: ...1 1 1 1 1 1 1 6 FRONT BEARING CAP 805 21 11 1 1 1 1 7 BALL BEARING 2Z ZZ 805 50 02 2 2 2 2 1 1 1 1 8 BALL BEARING 2Z ZZ 805 50 01 1 1 1 1 9 O RING 805 40 01 2 2 2 2 1 1 1 1 10 OIL SEAL 805 60 01 1 1...

Page 11: ...03 1 1 5 REAR BEARING CAP 805 27 04 1 1 1 1 1 1 1 1 6 FRONT BEARING CAP 805 27 05 1 1 1 1 7 BALL BEARING 2Z ZZ 805 50 02 2 2 2 2 1 1 1 1 8 BALL BEARING 2Z ZZ 805 50 01 1 1 1 1 9 O RING 805 40 01V 2 2...

Page 12: ...FF MM 370 REV 01 Page 12 Operation and Maintenance Guide 6 VM Air Motor Series Foot Mounting 6VM FACE Mounting 6VM Dimensional Data...

Page 13: ...FF MM 370 REV 01 Page 13 Operation and Maintenance Guide 6 VM Air Motor Series NEMA Flange Mounting 6VM IEC Flange Mounting 6VM...

Page 14: ...CRIPTION S NO We Hereby Certify That The Above Referenced Product Has Tested And Inspected In Accordance With Our Standard Test Pro cedures And Meets The Specifications For Material And Performance Va...

Page 15: ...EN ISO 80079 36 2016 Explosive atmospheres Part 36 Non electrical equipment for explosive atmospheres Basic method and requirements EN ISO 80079 37 2016 Explosive atmospheres Part 37 Non electrical e...

Page 16: ...after deposit with the transporter for shipment iii a Product is not properly preserved packaged stored processed or handled after receipt iv a Product is not used and maintained in accordance with T...

Page 17: ...FF MM 370 REV 01 Page 17 Operation and Maintenance Guide 6 VM Air Motor Series This page is intentionally Left blank...

Reviews: