10
1. Install the two plastic end caps onto each foot of the
storage legs.
2. Lift TKV 20 with 3-point, remove the wire lock pin (A)
and the storage stand will drop off. With the shorter end
of the leg down slide the stand into the storage channel
(B), and fasten with the wire lock pin (C). Repeat this
step for the storage stand on the other side.
3. Set the stop down on the 3-point lever where the
PTO shaft sits horizontally. Adjust sway chains
and adjustable lift link on 3-point arms to level
attachment.
4. For hydraulic systems without position control, it is
recommended that the 3-point arms are chained to
ensure that the TKV 20’s PTO shaft remains horizontal.
Machine Set Up
Assembly
Repositioning the TKV 20’s 3-Point Hitch Pins
For wider tractors, the hose from the boot to the blower
may get close or touch the rear tire of the tractor. The
positioning of the TKV 20’s 3-point hitch pins can be
shifted to the right by 2-1/2" by following the steps below.
1.
Remove the three shields (A).
2.
Remove the side pin brackets (B and C), flip them
over and reinstall them in the opposite positions. B
is now reinstalled where C was, and vice versa. (This
allows the side pin to stay on the bracket). Reinstall
hardware and torque to 30 +/-1 ft. lbs.
WARNING:
Place storage stands in storage
channel before mowing to prevent damage.
CAUTION
: Operating PTO on an angle will cause
excessive wear or damage.
B C
A
C
B
A