APPLIANCE INFORMATION
ASSEMBLY INSTRUCTIONS
EKY/B series boilers are designed to burn different types of fuels such as wood, walnut coal,
quince coal and low-calorie brown coal in ranging capacities. As it is known, the shaft gasses
which occur as a result of burning wood and coal, and condensation of water vapors shall take
place. Make sure not to operate the boiler below 45°C. In case of operation below 45°C, the
temperature of the shaft will be low and this will cause the shaft draft to be insufficient and result
in condensation. Therefore, the life span of the boiler shall be shorter due to corrosion in short
time. This is designed to prevent the substantial decrease in the boiler outlet water temperature
and acid drop (sulfuric acid) resulting from condensation by means of cooling the firebox.
In order to increase the combustiom efficiency adjust the placement of the air supply window om
the upper door of the boiler.
3
The boiler should be leveled and installed at least at a distance of 20 cm from ground in boiler
rooms on a durable surface.
The boiler room should be regularly ventilated according to regulations and rule.
When assembling EKY/B series boilers, it is required to use open expansion tank. The
expansion tank should be located at the top of the installation and the safety pipes should be
connected to the inputs and outputs of the boiler in the shortest route possible. There should never
be any flow control units (valve, check valve, etc.) over the safety pipes. Make sure that the open
expansion tank is always full. The expansion tank volumes suitable for each boiler are given in
the table (at the page 5).
WRONG
CORRECT
WRONG
CORRECT
HEATING SYSTEMS