proper burning from your boiler.
16.
If you observe an abnormal condition regarding the boiler, take the necessary precautions
immediately and contact our authorized services.
17.
After the initial ignition of the boiler, the temperature of the boiler water must reach
temperature of 60°C. As soon as the temperature has been reached, set the thermostat's value as
60°C to open the air supply window for 2 mm. Further control of the air supply window will be
done mechanically in respect with the settings of the thermostat.
18.
In order to set the highest value of the temperature, use the thermostat.
In order to benefit from the maximum efficiency of the boilers, regulate the air supply window on
the upper door of the boiler.
19.
Pay attention to the structure of the smoke pipe in order to benefit from the maximum
efficiency of the boiler.
20.
Do not leave the boiler unattended for a long time, since it's required to change the settings of
the thermostat regularly.
You should contact Termodinamik Company for appliance fuel conversion. You
should be informed by the Company on the conditions of conversion and the
procedure to be followed.
12
Boiler must be operated according to the operation instructions.
Inside of the boiler any petrolium metarials (such as styrofoam, nylon, cloth etc...)
which will cause pitch, should not be burned.
Smooth surfaces should be used as far as possible in order to reduce friction on the
inside surfaces of the chimney.
The Company cannot be held liable if the boiler consumes too much fuel in case the
boiler is not used according to the user and maintenance manual provided with the
boiler or the desired comfort temperature is not reached, of heat loss due to the
heated area and of low calorific value of the fuel that is being used.
Hydrometer must be installed to an easly visible location.
Open expansion tank must be used for EKY/B boilers.
Gas tightness of the chimney must be ensured.
HEATING SYSTEMS