![Termodinamik EKY/B 20 Installation And Usage Manual Download Page 11](http://html.mh-extra.com/html/termodinamik/eky-b-20/eky-b-20_installation-and-usage-manual_1089224011.webp)
In places where the weather is very cold or there is risk of freezing, the expansion tank,
expansion input and output pipes should be insulated.
The input pipes connecting to the expansion tank should be assembled without turning
downwards and should steadily level up when going from the boiler to the expansion tank.
A hydrometer should be installed to the assembly in order to control the water level of the
system.
Make sure not to install units like valves, filters, check valve, etc. over the safety pipes
between the expansion tank and the boiler.
When water comes out of the messenger pipe, it means that the expansion tank is full and
the boiler has reached a specific pressure level. This should be checked at times when water
is pumped to the boiler from the main water supply.
EKY/B 20-60 EXPANSION TANK CONNECTION CHART
POSTURE OF THE SHAFT ON THE ROOF
8
These are containers
open to
atmosphere
and they should be
installed a distance from the top of the
pipe system for hot water systems or at
a distance from the radiator level at the
top.
For the manual feeding boiler, open
expansion tank must be used.
AIR VENT
MESSENGER
PIPE
OUTPUT
FROM
EXPANSION
INPUT TO
EXPANSION
The shaft opening should be at a distance from
the roof ridge for slant tiled roofs.
The shaft opening at a distance from the roof
ridge (only tiled roofs).
The shaft opening should be at a distance
from of at least 80 cm from the roof ridge
for slant roofs.
Roofs with little slant.
HEATING SYSTEMS