Termodinamik EKY/B 20 Installation And Usage Manual Download Page 5

EKY/B 20-60 TECHNICAL SPECIFICATION

W

e ar

e r

eser

ved the righ

t t

o mak

e chang

es in dimensions and appear

ance.

EK

Y/B 20

EK

Y/B 30

EK

Y/B 40

EK

Y/B 50

EK

Y/B 60

1135

1135

1285

1285

1285

590

730

790

930

1060

158

158

158

158

158

F Flue

Diameter

(mm)

G (Boiler

Inlet-

Outlet)

H (Boiler

Filling-Discharge)

I (Safety

Input-

Output)

kg

W

eight

W

ater

V

olume

20

30

40

50

60

EK

Y/B 20

EK

Y/B 30

EK

Y/B 40

EK

Y/B 50

EK

Y/B 60

3

3

3

3

3

4,5

4,5

4,5

4,5

4,5

60

75

85

100

1

15

235

280

320

350

390

394x330

394x330

394x460

394x460

394x440

425

425

530

530

510

500

640

700

840

970

J  GRILLE

HEIGHT

(mm)

K  GRILLE

DEPTH

(mm)

Capacity

(Coal)

Kw

(bar)

Operating

Pressure

(bar)

Test

P

ressure

Fuel L

oading

Lid Dimensions

(mm)

2

HEATING  SYSTEMS

R 1  1/4"

R 1  1/4"

R 1  1/4"

R 1  1/4"

R 1  1/4"

530

530

530

530

530

Summary of Contents for EKY/B 20

Page 1: ...EKY B 20 60 SOLID FUEL HOT WATER BOILER INSTALLATION AND USAGE MANUAL 20 kW 60kW HEATING SYSTEMS ...

Page 2: ...tart using the product and save it to refer to in the future This manual will help you to operate your device safely and efficiently For this reason you should pay attention to these Please read this instruction book carefully before you install and operate the product Follow the instructions and the rules on safe usage The instruction book may apply to other models as well the differences between...

Page 3: ...al Specification 1 Appliance Information 3 Expansion Tank Selection 5 EKY B 20 60 Installation Chart 6 EKY B 20 60 Expansion Tank Connection Chart 8 Chimney 9 Operation of the Boiler 11 Malfunctions and Troubleshooting 16 HEATING SYSTEMS ...

Page 4: ...EKY B 20 60 TECHNICAL SPECIFICATION 1 EKY B 20 60 SIDE VIEW B F I A G H J K HEATING SYSTEMS D ...

Page 5: ...lling Discharge I Safety Input Output kg Weight Water Volume 20 30 40 50 60 EKY B 20 EKY B 30 EKY B 40 EKY B 50 EKY B 60 3 3 3 3 3 4 5 4 5 4 5 4 5 4 5 60 75 85 100 115 235 280 320 350 390 394x330 394x330 394x460 394x460 394x440 425 425 530 530 510 500 640 700 840 970 J GRILLE HEIGHT mm K GRILLE DEPTH mm Capacity Coal Kw bar Operating Pressure bar Test Pressure Fuel Loading Lid Dimensions mm 2 HEAT...

Page 6: ... acid resulting from condensation by means of cooling the firebox In order to increase the combustiom efficiency adjust the placement of the air supply window om the upper door of the boiler 3 The boiler should be leveled and installed at least at a distance of 20 cm from ground in boiler rooms on a durable surface The boiler room should be regularly ventilated according to regulations and rule Wh...

Page 7: ...ut any downward bending 4 The boiler should be connected to the chimney of the building without narrowing the diameter at the flue outlet and through pipes having minimum the same or larger diameter at the flue outlet and through pipes having minimum the same or larger diameter as the boiler flue outlet For installation of the boiler warning points indicated in the user manual must be taken into c...

Page 8: ...e evaluation and calculations depending on the location and operation conditions of the boiler 5 Boiler Capacity Kcal h Boiler Capacity kW If Cast Sectional Heating Radiators are used If Panel Radiators are used 45 L 65 L 87 L 108 L 17 000 25 800 34 400 43 000 20 30 40 50 26 L 42 L 58 L 72 L HEATING SYSTEMS 60 51 600 129 6 L 86 4 L ...

Page 9: ...let from the Radiators C Open Expansion Tank D Inlet to the Expansion Tank E Outlet from the Expansion Tank F Messenger Line G Radiators H Air Purge Valve I By Pass Line Valve J Main Pump Valve K Main Pump L Filling Valve C H A B E F I L G G D PUMP ON OUTLET K J J ...

Page 10: ...ansion Tank D Inlet to the Expansion Tank E Outlet from the Expansion Tank F Messenger Line G Radiators H Air Purge Valve I By Pass Line Valve J Main Pump Valve K Main Pump L Filling Valve C H B F G G D PUMP ON INLET E K J J I 6 EKY B 20 60 INSTALLATION CHART A L I ...

Page 11: ...nd the boiler has reached a specific pressure level This should be checked at times when water is pumped to the boiler from the main water supply EKY B 20 60 EXPANSION TANK CONNECTION CHART POSTURE OF THE SHAFT ON THE ROOF 8 These are containers open to atmosphere and they should be installed a distance from the top of the pipe system for hot water systems or at a distance from the radiator level ...

Page 12: ...g of other solid fuel boilers then it is possible to connect multiple boilers into a common flue system In such cases the configuration indicated in the figure should be considered Another point to be observed is that the angle of the flue connection with horizontal axis of the second boiler to be connected should be less than the first one The second boiler s flue connection to main flue connecti...

Page 13: ...d not allowing for the formation of tarry soot inside which makes it impossible to clean the shaft The flue pipe chimney mustn tbe mounted with level which prevent the drought of it End of the chimney must be 40 cm higher than tip of the roof Chimney should be well insulated and heat losses should be reduced When the chimney cools down the draught also decreases and in the cooled chimney the forme...

Page 14: ... upper door of the boiler 8 Note that the quality of the fuel you shall use shall directly affect the efficiency of the boiler quality of the burning amount of ashes and cleaning periods and the amount of bunt coal Therefore we recommend you to buy some amount of sample fuel to check the performance of the coal before purchasing large amounts 9 The lever located near the boiler which allows for th...

Page 15: ...attended for a long time since it s required to change the settings of the thermostat regularly You should contact Termodinamik Company for appliance fuel conversion You should be informed by the Company on the conditions of conversion and the procedure to be followed 12 Boiler must be operated according to the operation instructions Inside of the boiler any petrolium metarials such as styrofoam n...

Page 16: ...gger hook fixed to the chain Pass the other chain end through the fixture on the boiler door and fix this free end on the hanging chain Check if the chain is hanging freely and the lever moves freely when turning the knob If the regulator is installed in the a position the white scale applies For installations in the b and c positions the red scale applies Regulator calibration Fire the boiler wit...

Page 17: ...s It is hard to specify before the effects of such compounds and their each component on the boiler Organic compounds may decompose and may form carbonic acid and other acidic compounds ad these may cause corrosion and punctures in the boiler This may cause the formation of materials such as limestone and foaming which should be experienced at the minimum level It should be considered that waters ...

Page 18: ... level in the boiler before each operation The boiler should be operated as per the burning instructions and the flame in the burning chamber should be controlled and full burning should be provided Smoke pipes the turbulators inside the smoke pipes and the smoke box where the boiler is connected to the shaft should be cleaned at least once a week Clean the shaft at least 3 times in a season Clean...

Page 19: ...ROOM HEATER INSTALLATION CHART RADIATOR INSTALLATION CHART FOR MULTIPLE STORE BUILDINGS 1 OPEN EXPANSION TANK 3 RADIATOR BOILER 2 3 BOILER 1 OPEN EXPANSION TANK RADIATOR 2 16 HEATING SYSTEMS ...

Page 20: ...LEM REASON SOLUTION Inefficient burning in the burning chamber Inefficient draught Calibrate the draft regulator Clean the boiler Use high quality and dry fuel Low calorie or non quality fuel Improper draft regulator settings HEATING SYSTEMS ...

Page 21: ...NE FAX COMPANY EXECUTIVE SIGN SEAL PRODUCT PRODUCER TYPE OF PRODUCT MARK MODEL BANDEROLE AND SERIAL NUMBER DATE AND PLACE OF DELIVERY SELLER COMPANY TITLE ADRESS PHONE AND FAX INVOICE DATE AND NUMBER DATE SIGN SEAL PRODUCER INFORMATION Kemalpaþa OSB Mah 80 Sokak No 10 KEMALPAÞA ÝZMÝR TURKEY ...

Page 22: ...Tel 90 232 877 12 12 Fax 90 232 877 08 67 www termodinamik com tr Kemalpaþa OSB Mah 80 Sokak No 10 KEMALPAÞA ÝZMÝR TURKEY HEATING SYSTEMS ...

Reviews: