![Terex TC29 Operating Instructions Manual Download Page 45](http://html1.mh-extra.com/html/terex/tc29/tc29_operating-instructions-manual_1088806045.webp)
Work Operation
5
TC29
39
5 Working Operation of the Machine
5.1 General
The excavator is equipped as standard with an
"ISO"-control (function of control levers 22/1 and
22/10) on which the following description is based.
Optionally
, a change-over control for the work
equipment can be installed. For change-over,
operate the lever (22/12).
If the customer so wishes, the excavator
can be equipped with a special control.
Your excavator must therefore be
checked to see whether or not a special
control is installed. Incorrect handling
may endanger persons or objects.
When lifting and lowering the exit barrier
(22/2), ensure that no other operating
levers and/ or pedals are actuated.
Danger of accident due to
uncontrolled machine movements!
When the exit barrier (22/2) is lifted all
work and travel functions are
deactivated.
Before working with the excavator, memorize the
lever controls well. Start at low rpm when
familiarizing yourself with the controls.
5.1.1 Lever controls
1
Brake - slewing
2 ISO
control
3 Grab,
hammer
4 Articulation
5 Left
travel
6 Right
travel
7 Dozer
blade
8 ISO
control
9 Grab,
hammer
10 Hand
throttle
11 Signal
horn
Fig. 22-Exit barrier
1
5
2
6
10
8
3
7
11
9
4
TC29_35_48
Fig. 22a – Lever controls
Summary of Contents for TC29
Page 6: ...Table of Contents TC29...
Page 22: ...3 Technical Data TC29 16 Views with canopy Fig 5 Views with canopy...
Page 34: ...3 Technical Data TC29 28...
Page 90: ...8 Operating Problems TC29 84...
Page 94: ...9 Appendix TC29 88...