Second Edition • First Printing
Operator's Manual
Operating Instructions
Part No. 1314200GT
Genie Lift
™
25
Setup
Select an area that is firm, level and free of
obstructions.
Follow the Setup procedures in the Function Tests
section.
Raising and Lowering Load - Manual
Winch
1
Center the load on the forks or load platform.
2
Raise the load by firmly grasping the winch
handle and rotating it clockwise. Do not allow
the cable to wind unevenly onto the winch
drum.
3
Lower the load by firmly grasping the winch
handle and rotating it counterclockwise. After
lowering to the desired position, turn the winch
handle clockwise (raise the load) 1/4 turn to
set the brake.
Moving Machine with a Load
It is best to move the machine on the work site
with no load. Moving a raised load should be
restricted to positioning for loading and unloading.
If it is necessary to move the machine with a
raised load, understand and obey the following
safety rules:
Make sure the area is level and clear of
obstructions.
Make sure the load is centered on the forks
or load platform.
Avoid sudden starts and stops.
Travel with the load in the lowest possible
position.
Keep personnel away from the machine and
load.
Do not tilt the machine back with a raised
load.