Fifth Edition • First Printing
Operator's Manual
Inspections
Part No. 1298034GT
AWP
®
Super Series
21
Function Tests
Setup
1
Position the machine on a firm surface directly
below the desired work area.
2
Connect to the appropriate power source.
DC models: Connect the battery pack.
AC models: Connect to a grounded 15A AC
power supply. Use a 12 gauge / 3.3mm
2
3-
wire grounded extension cord no longer than
50 feet / 13 m.
Air models: Connect the air line.
3
Insert the key and turn to platform control.
4
Pull out the red Emergency Stop button to the
on position at the ground controls.
5
Twist to release the red Emergency Stop
button at the platform controls.
Result: AC & DC models: The power light
should come on.
Air models: The air pressure gauge should
read 80-110 psi /5.5 - 7.8 bar.
6
Select an outrigger
and slide it into a base
socket until the
outrigger lock pin
snaps into place.
Adjust the outrigger to
level the machine and
raise the base casters
slightly off the ground.
Level the machine
using only the
outriggers.
7
Check the interlock
display lights at the
ground controls.
Confirm that the
corresponding light is
on.
8
Repeat this procedure for each of the
remaining outriggers.
9
Use the bubble level and adjust the leveling
jacks until the machine base is level.