3-5
(6)Place level gauge on the surface of the flange,and check that the flange is
perfectly horizontal.If it is not,use the metal wedges to adjust it.
(7)Confirmation of shaft alignment.
The shafts is aligned before shipment.However,if the shafts may become offset
during transport,re-align it at site.
(8)Pour mortar into the anchor bolt holes,the gap under the common base,and the area
around the common base after alignment of shafts is completed.
When the mortar has fully cured,tighten the anchor bolts.
Be sure to align the shafts correctly.
If they are not correctly aligned,damage to the equipment,
vibration or noise could result.
If you remove the shaft coupling cover to align the shafts,
BE SURE to fix it back in place before running the pump.
If the cover is left off when the pump is run,body parts could get caught up
by the rotating parts,resulting in serious injury.