OPERATION EN
19
OS3 DM20036 (1
−
2018)
19.Confirm new e
−
cell installation.
20.Verify correct installation on the
Wear
Component Status Indicators
panel. All
segments on the progress bar will display as
green indicating a new e
−
cell.
GREEN
21.Remove USB drive from the USB port.
22.Reinstall front access panel and secure with
key.