7. Check to make sure the machine is secure.
8. Service the machine as required.
9. When finished servicing the machine, raise the
machine up off the jack stands.
10. Remove the jack stands from under the
machine.
11. Lower the machine.
12. Remove the blocks from the tires.
MACHINE TIE--DOWNS
The machine may be tied down at each of the four
corners of the machine at the locations specified.
To tie the machine down, use the tie down lug
provided.
A
B
01456
FRONT TIE--DOWN LUG (RIGHT SIDE SHOWN)
A. Machine Frame
B. Tie--Down Lug
A
B
01455
REAR TIE--DOWN LUG (LEFT SIDE SHOWN)
A. Machine Frame
B. Tie--Down Lug
When transporting the machine on a trailer or in a
truck, be sure to engage the machine parking brake
and block the machine tires to prevent the machine
from rolling.
Summary of Contents for 96GR
Page 1: ... Operator Manual ...
Page 12: ...SPECIFICATIONS 95GR MM199 10 89 1 2 ...
Page 16: ...SPECIFICATIONS 95GR MM199 10 89 1 6 ...
Page 18: ...OPERATION 95GR MM199 10 89 2 2 ...
Page 36: ...OPERATION 95GR MM199 10 89 2 20 ...
Page 47: ...MAINTENANCE 3 11 95GR MM199 10 89 04307 HYDRAULIC SCHEMATIC ...
Page 60: ...MAINTENANCE 95GR MM199 10 89 3 24 04309 ELECTRICAL SCHEMATIC ...
Page 61: ...MAINTENANCE 3 25 95GR MM199 10 89 01502 ELECTRICAL SCHEMATIC ACCESSORIES ...
Page 82: ...APPENDIX 95GR MM199 10 89 4 2 ...