
8
4000 Series Char-Lynn Motors
Reassembly
36 Apply a light film of petroleum jelly on 88,6 mm [3.49 inch] I.D.
seal. Install seal in valve plate.
37 Align case drain hole in valve plate with case drain hole in Geroler.
Install valve plate (seal side toward Geroler) on Geroler as shown in
Figure 16.
Timing Step No. 2 — Locate slot opening in valve plate which is in
line with largest open pocket of Geroler (see Figure 16).
38 Use the following procedure for installing the valve on the valve
plate.
Timing Step No. 3 — Locate any one of the side openings of the
valve that goes through to the face of the valve. Line up this side
opening in the valve with open slot of valve plate that is in line with
largest open pocket of Geroler. Rotate valve clockwise (1/2 spIine
tooth) to engage valve with the valve drive spline, alignment reference
shown in Figure 17 (above). This procedure provides standard timing
when pressurized as shown in Figure 17.
39 Apply clean grease on balance ring assembly springs. Install
springs in 2 holes located inside bore face of valve housing (see
Figure 18).
41 Apply a light film of petroleum jelly on 82,3 mm [3.24 inch] I.D.
seal. Install seal in outside seal groove of valve housing.
42 Apply petroleum jelly on inner and outer face seals. Install seals on
balance ring as shown in Figure 19.
Important: Install face seals in the positions shown in Figure 19 or
the motor will not operate properly. Do not force or bend these face
seals. Any damage to these seals will affect the operation of the
motor.
43 Align 2 pins of balance ring with 2 spring holes in valve housing as
shown in Figure 20 . Install balance ring in valve housing.
40 Apply a light film of petroleum jelly on 8,9 mm [.35 inch] I.D. seal.
Install seal in case drain groove of valve housing.
Figure 19
Balance Ring
Pin
Inner Seal
Outer Seal
Valve
Housing
Seal
Figure 18
Seal
Balance Ring
Spring
Clockwise
Rotation
Counter
Clockwise
Rotation
Figure 17
Figure 20
Figure 21
Summary of Contents for 6500
Page 1: ...6500 6550 330275 Rev 02 5 02 Service Manual Gas LP Diesel 330275 ...
Page 24: ...GENERAL INFORMATION 6500 6550 330275 5 02 1 22 ...
Page 26: ...CHASSIS 6500 6550 330275 6 98 2 2 ...
Page 36: ...CHASSIS 6500 6550 330275 6 98 2 12 ...
Page 38: ...SWEEPING 6500 6550 330275 5 02 3 2 ...
Page 84: ...SWEEPING 6500 6550 330275 6 98 3 48 ...
Page 149: ...ELECTRICAL 4 65 6500 6550 330275 6 98 Volts D C C B 6 1E RED 22 YELLOW ...
Page 182: ...ELECTRICAL 6500 6550 330275 5 02 4 98 ...
Page 184: ...HYDRAULICS 6500 6550 330275 6 98 5 2 ...
Page 209: ...HYDRAULICS 5 27 6500 6550 330275 5 02 ...
Page 210: ...HYDRAULICS 6500 6550 330275 6 01 5 28 6500 HYDRAULIC SCHEMATIC METAL HOPPER 1 2 3 4 5 ...
Page 212: ...HYDRAULICS 6500 6550 330275 6 01 5 30 6500 HYDRAULIC SCHEMATIC PLASTIC HOPPER 1 2 3 4 5 ...
Page 214: ...HYDRAULICS 6500 6550 330275 6 01 5 32 6550 HYDRAULIC SCHEMATIC 1 2 7 3 4 5 6 351758 6550 ...
Page 215: ...HYDRAULICS 5 33 6500 6550 330275 6 01 6550 HYDRAULIC SCHEMATIC 1 2 7 3 4 5 6 351758 6550 ...
Page 245: ......
Page 246: ......
Page 247: ......
Page 248: ......
Page 249: ......
Page 250: ......
Page 251: ......
Page 252: ......
Page 253: ......
Page 254: ......
Page 255: ......
Page 256: ......
Page 257: ......
Page 258: ......
Page 259: ......
Page 260: ......
Page 261: ......
Page 262: ......
Page 263: ......
Page 264: ......
Page 265: ......
Page 266: ......
Page 267: ......
Page 268: ......
Page 269: ......
Page 270: ......
Page 271: ......
Page 272: ......
Page 290: ...18 18 Model 70142 70144 and 70145 Notes ...
Page 291: ...19 19 Model 70142 70144 and 70145 Notes ...
Page 294: ...ENGINE G LPG 6500 6550 330275 6 98 6 2 ...
Page 330: ...ENGINE G LPG 6500 6550 330275 5 02 6 38 ...