          Figure 7. Cleaning the receiver of the smoke meter. 
 

Replacing the light source

 

If it’s necessary to replace the light source of smoke head, place carefully follow the next steps: 
Switch of the smoke meter and let the smoke head cool down until ambient temperature. Loosen the left mounting 
ring and take out the cone from the smoke chamber. Take out the bulb support and remove the light source. 
Open the plastic cover of the new light source at the bottom, but leaf the plastic around the bulb. Carefully press the 
new light source with its two pins at the bottom into the holder of the support. Remove the plastic cover. Never 
touch the light source with you fingers!  Place the support into the cone and put the cone into the smoke chamber. 
Tighten the mounting ring. Switch on the smoke meter and perform a zero calibration. Check that the smoke meter 
is not showing the error message again. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   

 

                 

    Figure 8. Replacing the light source. 

 
 
The EDA smoke head is equipped with a special halogen light source. Never use equivalent light sources, only the 
original. Please contact your supplier for these original spare parts. 
 
 
 
 

Summary of Contents for EDA 2

Page 1: ...ftware are the intellectual property of Test Equipment Nederland B V Each way of duplication of this manual or software is not allowed Test Equipment Nederland B V is not responsible for any direct or indirect damage arising from the use of the apparatus or manual The EDA 2 is tested and approved according the EMC directive 89 336 EC ...

Page 2: ...TEN Test Equipment Nederland B V C Version 3 0 February 2008 Pagina 2 Contents 1 Introduction 3 2 Preparations 4 3 Smoke test 6 4 Official test 8 5 Messages 10 6 Maintenance 10 7 Specifications 12 ...

Page 3: ...completely made of aluminum and uses the so called unique natural flow system that guarantees a minimum of maintenance In this user manual we describe the combination of the EDA2 smoke head and the INNOVA500 The INNOVA 500 has digital LED displays and a thermal printer to provide you all necessary information during a emission test Before using the EDA 2 it s absolutely necessary to read this user...

Page 4: ...RPM is recorded correctly If not repeat the procedure mentioned above at a different location of the injection pipe Figure 2 Placing the piëzo clamp Remark the piëzo clamp can not be used for all types of diesel vehicles for example common rail diesels Here for you need a special RPM adapter If you use an adapter always follow the instructions given by the manufacturer Oil temperature sensor Take ...

Page 5: ...ameter equal or larger than 70 mm Place the probe a far as possible in the exhaust Take care the gas flow in probe is correct Avoid sharps curves or bending Figure 3 Placing the sample probe The temperature of the sample probe can rise up to 200 ºC during a smoke test Always wear protection gloves while you are touching the exhaust or sample probe During a zero calibration of the smoke meter the s...

Page 6: ...displayed If the opacity and max opacity display shows the message you need to perform a zero calibration Press the zero calibration key to activate a zero calibration Figure 5 Zero calibration of the smoke head Important We advise you to perform a zero calibration regularly Take care that during a zero calibration the sample is removed from the exhaust of the vehicle Printing If you wish to print...

Page 7: ...during a test always use MODE Select mode A not filtered or mode B filtered Normally during a test always use mode B PROBE Select sample probe 1 or 2 Probe 1 Ø 10 mm exhaust diameter 70 mm passenger cars Probe 2 Ø 27 mm exhaust diameter 70 mm large commercial vehicles DIVISION Here you can set the division ratio for the RPM for example 1 2 3 4 etc DISPLAY Select what you want to display at the dis...

Page 8: ...l a temperature of 60 ºC is reached As soon as the engine temperature reaches 60 ºC the EDA automatically continues If the temperature of 60 ºC is not reached or you just want to continue press the Enter key Now the INNOVA 500 will proceed with the next program part After measuring the temperature the operator must be prepared to perform the free accelerations Between each acceleration the operato...

Page 9: ...Nederland B V C Version 3 0 February 2008 Pagina 9 Press the print key to get a full report of the official test with all recorded values Press the escape key to close the official test and return to the normal smoke test ...

Page 10: ...A 500 remove the power lead and let the smoke head cool down until ambient temperature Open the little lit of the main switch at the rear of the EDA no 12 of figure 2 Take out the fuses and place the new fuses in the holders of the lit Use 230 V 2AT fuses Close the lit In the smoke head the fuse holder is located at the bottom of the EDA 2 no 5 of figure 3 Press and open the holder by turning it c...

Page 11: ... of the new light source at the bottom but leaf the plastic around the bulb Carefully press the new light source with its two pins at the bottom into the holder of the support Remove the plastic cover Never touch the light source with you fingers Place the support into the cone and put the cone into the smoke chamber Tighten the mounting ring Switch on the smoke meter and perform a zero calibratio...

Page 12: ...30 mm Material Aluminum Diameter 55 mm Light source Halogen 6V 10W 3200 ºKelvin Receiver Siemens BPW21 with V filter Sample probe 10 mm 1 meter length Optional 16 mm 2 5 meter length 27 mm 1 meter length trucks 27 mm 3 5 meter length trucks Ranges Opacity 0 99 9 0 9 99 m 1 Oil temperature 0 150 ºC Cell temperature 0 150 ºC RPM 300 9990 1 min Resolution Opacity 0 1 0 01 m 1 Oil temperature 1 ºC Cel...

Reviews: