background image

Qtanium 400 | Installation Manual 

 

9

 

 

Installation 

This section describes the process of installing the Qtanium 400 on a vehicle. 

4.1 

Before Starting 

1.

 

Check that you have all the components needed to complete your installation. 

2.

 

Identify the best mounting location for the Qtanium 400 and the antennas. Make 
sure that the proposed location for the Qtanium 400 provides sufficient space for 
easy access to its connectors. 

3.

 

Test the proposed antenna locations, if possible, to check whether they provide the 
best performance. 

4.

 

Decide on the most suitable mounting method for your chosen location (screws / 
nuts and bolts / magnets). 

5.

 

On the asset, identify where you will connect: 

 

To asset’s chassis/after ground isolator switch (brown wire) 

 

To asset’s battery negative/before ground isolator switch (black wire) 

 

To asset’s +12/24V uninterrupted supply (red wire) 

 

To asset’s ignition/run signal (pink wire). 

6.

 

Check that the power cable is long enough to reach between the power source and 
your chosen location for the Qtanium 400. 

7.

 

Check that the antenna cables are long enough to reach between your chosen 
locations for the Qtanium 400 and the antennas. 

8.

 

Check that any other cables are long enough to connect the Qtanium 400 to any 
other optional devices or sensors.  

4.2 

Start the Installation 

1.

 

Disable the asset (turn the battery switch OFF or disconnect a battery post). 

2.

 

Mount the antenna and run the antenna cable but do NOT cut it. Where possible, 
choose a location where the antenna has a clear view of the sky and is protected 
from physical damage. (GPS performance will be impaired if the antenna cannot get 
a clear view of the sky). 

3.

 

Run the Qtanium 400 power cable. 

Summary of Contents for Qtanium 400

Page 1: ...Qtanium 400 INSTALLATION MANUAL...

Page 2: ...E POWER CABLE BUILT IN IPS UNIT 12 4 7 CONNECT THE EXTERNAL BATTERY BACKUP OR SOLAR PANEL OPTIONAL 13 4 8 CONNECT ANY OPTIONAL EQUIPMENT 14 4 8 1 Digital Inputs 14 4 8 2 Digital Outputs 16 4 8 3 Multi...

Page 3: ...Qtanium 400 Installation Manual iii...

Page 4: ...EXTENT PERMITTED BY LAW ALL REPRESENTATIONS AND WARRANTIES EXCEPT ANY WHICH MAY NOT LAWFULLY BE EXCLUDED ARE EXPRESSLY EXCLUDED INCLUDING WITHOUT PREJUDICE TO THE GENERALITY OF THE FOREGOING THE IMPLI...

Page 5: ...tions 6 Digital I O and 2 Multi I O an internal battery that is charged from a permanent external power supply such as the asset s battery through the power cable When fully charged the internal batte...

Page 6: ...choices of power cable 3 m 9 8 ft heavy duty 16 gauge wire plastic armored sheath with choke 6 m 19 6 ft heavy duty 16 gauge wire plastic armored sheath with choke 2 3 I O Cables for Optional Additio...

Page 7: ...nium 400 has an IP 67 rating Teletrac Navman recommends that you mount it in a location that will provide maximum protection from dust water and vibration The Qtanium 400 is rated up to 70 C but Telet...

Page 8: ...00 Installation Manual 8 due to the battery chemistry battery operation will be impaired at high temperatures in particular it will not charge when the temperature reaches or exceeds 45 C need to chec...

Page 9: ...e To asset s battery negative before ground isolator switch black wire To asset s 12 24V uninterrupted supply red wire To asset s ignition run signal pink wire 6 Check that the power cable is long eno...

Page 10: ...it is not a hazard to the users of the asset protected from heat sources and from chaffing on sharp edges connected to manufacturer s approved points and run along factory harnesses located where it...

Page 11: ...e permanent power source This connection must be fused 3 Amp slow blow Assets with a positive side isolation disconnect switch Connect on the battery side hot side of the manual or electronic positive...

Page 12: ...d apply adequate insulation to the wire 4 6 Connect the Power Cable Built in IPS Unit The new Qtanium has IPS built in and simplifies installations on assets that have a manual or electronic battery d...

Page 13: ...holder Black Ground Battery Negative before ground isolator switch Brown Ground Asset chassis connection after ground isolator switch Orange External Backup Battery Optional If required connect an ext...

Page 14: ...e based on I O from Digital Inputs This connectivity is provided through the 7 Way and 18 Way connectors on the front panel of the Qtanium 400 4 8 1 Digital Inputs The Digital Inputs must be connected...

Page 15: ...Qtanium 400 Installation Manual 15...

Page 16: ...ws STATE VOLTAGE High 0 5 V Low 0 2 V Disconnected 4 8 2 Digital Outputs The Digital Output s have an open collector transistor type arrangement and are controlled by the dispatcher through the Online...

Page 17: ...Reference source not found Digital Outputs When configured for Digital Output Multi I O 1 and Multi I O 2 operate as for the DO 1 and DO 2 lines Analogue Inputs When configured for Analogue Input Mult...

Page 18: ...also use some of the Multi I O and Digital Inputs for temperature event monitoring 4 8 6 Connect an 18 Way Cable Optional 1 To connect an 18 Way cable to the Qtanium 400 remove and retain the shippin...

Page 19: ...Way satellite modem cable Satellite Modem for Qube 4 and Qtanium 400 Installation Manual 4 9 Power Up the Qtanium 400 When the installation is complete perform the following steps in the order listed...

Page 20: ...ire see section 4 6 4 Start the engine and allow up to five minutes to initiate OnlineAVL2 DIRECTOR reporting 5 Check that OnlineAVL2 DIRECTOR shows an Ignition On event If not check the pink wire see...

Page 21: ...nium 400 if necessary 2 Apply Tamper Evident Seal Liquid inspector s lacquer to all fuse holders the ground screw and all connectors and blanking covers on the Qtanium 400 as shown 3 Tidy all wires wi...

Page 22: ...4 The Qtanium 400 may be outside an area with cellular data coverage Check cellular data coverage with the provider 5 The SIM card may need to be activated Call Teletrac Navman customer support to che...

Page 23: ...he shipping plug from the 18 Way connector then re install the 18 Way cable if used or replace the blanking cover 8 Start the engine and wait 1 5 minutes for the Qtanium 400 to reboot Qtanium 400 with...

Page 24: ...Qtanium 400 Installation Manual 24 6 Dimensions The mounting hole in each corner has a diameter of 5mm...

Page 25: ...dBm HSPA data rates 5 76 Mbps upload 7 2 Mbps download HSPA Fallback EDGE GPRS GSM quad band COMPREHENSIVE I O Ignition Input 1 fixed bias Digital Inputs 4 programmable bias inputs Digital Outputs 2...

Page 26: ...ectors 5 way power connector 5 pin 18 way serial 1 wire connector 18 pin 7 way I O connector 7 pin Serial Interface 2 2 wire RS 232 TX RX Ground 1 4 wire RS 232 TX RX RTS CTS Ground PHYSICAL Dimension...

Page 27: ...wire cable Qtanium 7 way I O cable Dallas 1 wire temperature sensors Dallas 1 wire iButton Driver ID reader Navman MDT860 Magellan Navigation PND Device M Nav 760 800 Serial Dallas 1 wire expander Wi...

Reviews: