
April
2018
Pathfinder DVL Guide
Page 40
EAR-Controlled Technology Subject to Restrictions Contained on the Cover Page.
Electrical and Grounding Testing Best Practices
Suggested steps to verify possible ground leakage of the Pathfinder DVL:
1. Turn your Power Supply output to OFF.
2. Connect the standard power connections from the Pathfinder cable to your power supply (24 volt
typical but could be anywhere in Pathfinder supply range).
3. Connect a single, 2ft +/-10% long, 22 gauge, wire to the - terminal of the Independent 12 volt sup-
ply or battery.
4. Add a 10K to 62kohm (+10% , 1/4W) resistor in series with this wire
5. Connect the other end of this wire (you can use an alligator clip) to one of the Anodes.
6. Connect the + of the Independent power supply or battery to the – PWR of your Pathfinder i.e.
also Neutral of your Power Supply (see figure below).
The goal is to create a -12 volt EMF relative to the ground of the standard DVL supply. Then use
the -12 volts to check the leakage current through a kΩ resistor.
Figure 23.
Ground Fault Current Check
7. After all the connections are made, turn the voltage supply output ON.
8. Assure that the DVL system is awake via TRDI Toolz.
9. After 30 seconds, measure the voltage across the resistor.
10. Apply the following equations to find the isolation impedance.
leak
r
battery
Bleed
Isolation
I
V
V
R
−
=
/