CTD-ES and CTD-ER Technical Manual
page 46
EAR-Controlled Technology Subject to Restrictions Contained on the Cover Page.
Step #4:
Continue threading the assembly until
the threads are no longer exposed and
the O-ring is seated onto the end cap.
Have an absorbent paper towel on hand
to clean up any overflow that you may
have.
Step #5:
Using hands only, tighten the assembly
onto the end cap to four inch-pounds.
*** HAND TIGHTEN ONLY! ***
*** MAXIMUM 4 INCH-POUNDS TORQUE ***
*** DO NOT OVERTIGHTEN ***
Have an absorbent paper towel on hand
to clean up any overflow that you may
have.
If no oil is observed in the capillary tube
repeat steps 1-5.
The installation is complete and the in-
strument is ready to be deployed.