1-50 Part III
Part III
Model 6600
Teledyne Analytical Instruments
Please refer to the Control Unit Section Part I of the
manual.
a
power
1
utility power (requires remote circuit
breaker operation) for pumps if
elected.. In the event the systems are
turned off for maintenance, etc.(in
particular, a bypass pump,
homogenizer).
2
Sample Utility manually 3-way
solenoid water valve, (selects
between sample or utility water-
usually operated manually).
3
Instrument power into control unit
(requires external circuit breaker
operation) for all autozero valves in
sample system, controlled by the
Instrument control unit.
Note: The cell purge solenoids may be
used in a particular application,
instead of zero prepared water.
b
Signal and Alarm connections
1
Please refer to the Reference
drawings below for connections and
test points for the signals and alarms.
2
a)
See Analog Outputs as
indicated under Section electrical
connections.
b)
See also section 1 for the
Analog 4-20 mA Output Calibration,
setup, testing and functioning.
Summary of Contents for 6600
Page 4: ...iv Model 6600 Teledyne Analytical Instruments ...
Page 8: ...iv Part I Model 6600 Oil in Water Analyzer Teledyne Analytical Instruments ...
Page 24: ...2 Installation Model 6600 2 10 Part I Teledyne Analytical Instruments ...
Page 64: ...iv Part II Model 6600 Oil in Water Analyzer Teledyne Analytical Instruments ...
Page 86: ...3 Maintenance Model 6600 3 10 Part II Teledyne Analytical Instruments ...
Page 147: ...Part III 1 57 Oil in Water Part III Teledyne Analytical Instruments ...