
ААНЗ.464414.001-03.61 РЭ p.24
The DC Power Supply Unit is installed into the mobile objects, using the AH570 shock
mount, bearing, brackets, and fasteners.
The order of installation:
- Fix the bearing on the power supply unit with screws.
- Install the power supply unit with the bearing onto the shock mount (put the
brackets, using the fasteners, onto the rack in advance, if necessary) and fix by the
locks.
The DC Power Supply Unit assembly drawing is presented in Figure 2.
Note
– There is no need to use brackets while installing the DC Power Supply Unit into
the mobile objects.
1.1.3.1.7
Installation of the Fill Gun Programmer Device (Fill gun)
The fill gun is intended to be used temporarily to prepare the radio for the performance.
Thus, there is no permanent mounting of the fill gun as a component part of the radio
specified. The fill gun is to be installed into the mobile objects in accordance with the mobile
object documentation.
The fill gun is assembled with other units in accordance with the drawing, presented in
Figure 4.