![Telair ENERGY 4010B User'S Operating Instruction And Installation Manual Download Page 9](http://html1.mh-extra.com/html/telair/energy-4010b/energy-4010b_users-operating-instruction-and-installation-manual_1079316009.webp)
Vers. 001
Energy 4010 B
GB
9
4.2.2 Floor fastening
The package contains a drilling jig, which allows
the generator bearing surface to be prepared
quickly, fig. 7.
Place a spongy, heat-
resistant gasket around the outlet opening of
the exhaust pipe. The gasket height must
reach the bottom of the generator and has the
purpose of preventing hot air from spreading
inside the generator compartment.
The brackets of the generator must be moved in
order to fasten the
Energy 4010B
on the bearing
surface.
On both sides, remove the hole plugs (fig. 8 ref.
1) and screw out the screws (fig. 8 ref. 2) in order
to remove the bracket (fig. 8 ref. 3).
Place the bracket (fig. 9 ref. 3) on the 4 holes
which were previously covered by the plugs
using the same screws (fig. 9 ref. 2) and apply
the hole plugs (fig. 9 ref. 1) in the seats which
previously housed the screws.