![Telair ENERGY 4010B User'S Operating Instruction And Installation Manual Download Page 23](http://html1.mh-extra.com/html/telair/energy-4010b/energy-4010b_users-operating-instruction-and-installation-manual_1079316023.webp)
Vers. 001
Energy 4010 B
GB
23
8 ROUTINE MAINTENANCE SCHEDULE
ROUTINE MAINTENANCE SCHEDULE
To be performed after the period of time or the number
of running hours listed here, whichever the earlier
.
Every
use
First
Month
or
20 hours
Every
3 Months
or
50 hours
Every
6 Months
or
100 hrs
Every
12 Mths
or
300 hrs
Level check
■
Engine Oil
Replacement
■
(2)
■
(2)
Air Filter
Clean and replace if necessary
(1)
■
(2)
Fuel Filter and
Tank
Clean and replace if necessary
■
(2)
Spark plug
Clean and replace if necessary
■
(2)
Valve
Adjustment
Check - Adjust
■
(2)
Fuel Pipe
Check for leaks or cracks
■
(2)
Check for leaks or cracks
■
(2)
Muffler
Clean and replace spark
screen if necessary
■
(2)
Air Choke Valve Check correct operation
■
(2)
Engine rpm or
Frequency
Check - Adjust
■
(2)
Vibration
Damper
Suspension
Points
Check – Replace if necessary
■
(2)
NOTES: (1) Clean more frequently if you use it in a very dusty environment
.
(2) These operations must be performed by specialised personnel only.