P6015A Instruction Manual
2–1
Performance Verification
The performance verification procedure verifies that the P6015A
performs as described in the Specifications section of Chapter 1. This
procedure can also be used as an acceptance check. The procedure is
given in the next section, Adjustments.
The performance verification consists of the long-form compensa-
tion procedure with an additional step to check bandwidth and rise
time:
1. Check DC attenuation and adjust if necessary
2. Check low-frequency compensation and adjust if necessary
3. Check transient response and adjust if necessary
4. Check bandwidth and calculate rise time
Summary of Contents for P6015A
Page 4: ......
Page 12: ...Service Safety Summary viii P6015A Instruction Manual...
Page 14: ...Service Safety Summary x P6015A Instruction Manual...
Page 15: ...User Information...
Page 16: ......
Page 18: ...Overview 1 2 P6015A Instruction Manual Guard Ring Figure 1 1 The P6015A High Voltage Probe...
Page 38: ...In Detail 1 22 P6015A Instruction Manual...
Page 46: ......
Page 47: ...Service Information...
Page 48: ......
Page 50: ...Performance Verification 2 2 P6015A Instruction Manual...
Page 73: ...Index...
Page 74: ......