Figure 2: LE user interface
6.
Complete the other connections as shown in the illustration.
7.
Allow all equipment to warm up for at least twenty minutes.
Functional check
procedure
Verify that the equipment is set up properly as shown in the previous diagram
Figure 1: Functional check equipment setup
1.
Set up the pattern generator for a 16 Gbp/s 1010 waveform with a 800 mV
p-p
output.
2.
Verify that the linear equalizer is set up as follows:
a.
Click the
Connect
button in the user interface to connect the application
to the linear equalizer.
b.
Select the
4T
tab.
c.
Enable Channel 1 on the linear equalizer and set the amplitude for
approximately 800 mV
P-P
output.
The Channel 1 button should be highlighted in green.
d.
Adjust the
Output Amplitude
control on the linear equalizer to
800 mV
P-P
.
The LE display should look similar to the following figure.
Performance verification
10
LE160 & LE320 Specifications & Performance Verification
Summary of Contents for LE160
Page 4: ......
Page 6: ...Table of Contents ii LE160 LE320 Specifications Performance Verification ...
Page 14: ...Compliance Information x LE160 LE320 Specifications Performance Verification ...
Page 16: ...Preface 2 LE160 LE320 Specifications Performance Verification ...
Page 28: ...Performance verification 14 LE160 LE320 Specifications Performance Verification ...
Page 30: ...Test record 16 LE160 LE320 Specifications Performance Verification ...