
Section 3: Performance Verification
Model 2231A-30-3 Triple-Channel DC Power Supply Performance Verification
3-16
077102700/ July 2014
220
198V
2. Set the voltmeter as follows:
a. Set to measure DC volts.
b. Set to auto range.
c. Verify that the math mx+b function is disabled (shift+DCV), assuring that volts are being read.
3. Set the electronic load as follows:
a. Set to constant current.
b. Set to draw the specified test current.
Channel
Test current
Channel 1
3A
Channel 2
3A
Channel 3
3A
4. Set the channel under test to 100% of the full scale output current.
5. Set the channel under test to 100% of the full scale output voltage.
6. Turn the DUT output on.
7. Enter the voltmeter reading the "min" column of the table for checking DC Voltage Line
Regulation for the channel under test.
8. Change the AC power source output to the maximum voltage specified in the following table.
DUT voltage selector
switch
AC power source voltage
110
132V
220
253V