
Section:
Description:
Page No:
Date:
INSTALL HOOK
May 2020
2 of 10
TLE_507a
ELECTRICS
LIGHTING, ELECTRICS AND COMMUNICATIONS
STEP 1a: Loosen the Screws on the Hook. Slide in the Hook and install the Hook underneath the Panel Rail using the Screws provided.
Loosen Screw (F)
WARNING: Power MUST be
turned off during all installation
or reconfiguration work.
Remove
Slide in
Tighten Screw
POWER BOX (EKQP) INSTALLATION - WORKSURFACE LEVEL
C1
F
E
D