background image

FO 935 ETH

 

 

 

 
 

 

 
 

 
 
 
 
 
 
 
 
 

 
 

 

  

PAGE 

1)   SAFETY REQUIREMENTS 

………....................................... 

2)   ACCESSORIES 

………………………………….. 

3)   TECHNICAL SPECIFICATIONS 

………………………………….. 

 

FO 935 ETH 

………………………………….. 

— 

 

CONC. CFO 521 

…………………………………. 

 

FO TEMPERATURE SENSORS 

………………………………….. 

— 

4)    FO 935 ETH FRONT PANEL 

………………………………….. 

 

DISPLAY 

………………………………….. 

10 

 

OPERATING PROGRAM CONTROL 

 …………………………………. 

— 

 

NOTES ON SCAN AND MAN FUNCTIONS 

………………………………….. 

— 

 

LED TEST 

………………………………….. 

— 

 

ALARM RELAY TEST 

………………………………….. 

— 

 

ALARM RELAY SILENCING 

………………………………….. 

— 

5)   CFO 521 / FO SENSORS 

………………………………….. 

11 

 

CFO 521 DIMENSIONS / INSTALLATION 

………………………………….. 

— 

 

FO SENSORS DIMENSIONS / INSTALLATION 

………………………………….. 

12 

 

CONC. CONNECTIONS CFO 521 

………………………………….. 

— 

 

CFO 521 CONCENTRATOR OPERATION 

………………………………….. 

13 

6)   FO 935 ETH ASSEMBLY 

………………………………….. 

14 

7)   ELECTRICAL CONNECTIONS 

………………………………….. 

15 

 

FO 935 ETH BACK 

………………………………….. 

 

 

POWER SUPPLY 

………………………………….. 

16 

 

ALARMS AND VENTILATION 

………………………………….. 

— 

 

FAULT AND RESET MESSAGE SEQUENCE 

………………………………….. 

— 

 

CONC. SENSOR DIAGNOSTICS CFO 521 

………………………………….. 

17 

 

PROGRAMMED DATA DIAGNOSTICS 

………………………………….. 

— 

 

TEMPERATURE DIAGNOSTICS 

………………………………….. 

— 

 

 
 
 

INTRODUCTION 

First  of  all  we  wish to thank  you  for  choosing to  use  a 

TECSYSTEM

  product  and  recommend  you  read  this instruction 

manual  carefully:  You  will  understand  the  use  of  the  equipment  and  therefore  be  able  to  take  advantage  of  all  its 
functions. 

  

 
 

ATTENTION! THIS MANUAL IS ONLY VALID FOR THE VERSION FO 935 ETH. 

 

TABLE OF CONTENTS

 

Summary of Contents for FO 935 ETH

Page 1: ...with ISO9001 certified quality system http www tecsystem it R 1 0 12 01 22 Translations of the original instructions ENGLISH TECSYSTEM S r l 20094 Corsico MI Tel 39 024581861 Fax 39 0248600783 FO 935...

Page 2: ...21 CFO 521 CONCENTRATOR OPERATION 13 6 FO 935 ETH ASSEMBLY 14 7 ELECTRICAL CONNECTIONS 15 FO 935 ETH BACK POWER SUPPLY 16 ALARMS AND VENTILATION FAULT AND RESET MESSAGE SEQUENCE CONC SENSOR DIAGNOSTIC...

Page 3: ...TES DATA TRANSMISSION NOTES ON ETHERNET ELECTRICAL CONNECTIONS FUNCTION CODE CODE 3 10 CODE 16 10 NOTES FOR REMOTE PROGRAMMING 22 ERROR CODES UNACCEPTABLE DATA ILLEGAL DATA 23 MODBUS MAPPING TABLE 11...

Page 4: ...y exceeding 90 and never touch with wet or damp hands If any liquid penetrates the control unit disconnect it immediately and contact technical assistance CLEANING Disconnect the power cable before cl...

Page 5: ...inal 4 pitch poles 3 81 connection CFO 521 Code 2PL0368 Screws tightening torque 0 25Nm CFO 521 Concentrator CFO 521 Concentrator Start guide and QR code 2 Terminals 4 pitch poles 3 81 connection FO 9...

Page 6: ...oards OUTPUTS 2 alarm relays ALARM AND TRIP SPDT 1 relay for faulty probes or operating anomaly FAULT SPST 2 ventilation management relays SPST FAN 1 and FAN 2 Output relays with 10A 250Vca res COS 1...

Page 7: ...s to display temperatures messages and channels 3 LEDs to display the state of the alarms of the selected channel ALARM TRIP FAULT 4 LEDS selection of display mode SCAN AUTO MAN T MAX 2 LEDs to displa...

Page 8: ...m 25 C to 60 C Permitted humidity 90 without condensate Degree of protection IP00 PC UL 94 HB container Electronic part protective treatment Optional DIMENSIONS 145x106 7x55mm CONC concentrator fixing...

Page 9: ...ication RS green LED 5 FAULT signalling red LED 16 3 digit channel display 6 FAN 1 yellow LED 17 T max mode selection red LED 7 FAN 2 yellow LED 18 Man mode selection yellow LED 8 Display mode selecti...

Page 10: ...ameters listed in the programming paragraph on pages 19 20 Return the control unit to TECSYSTEM for repairs 3 TEC err this message appears when a loss of communication is detected between the thermome...

Page 11: ...rature of the concentrator ranges from 25 C to 60 C therefore ensure there is adequate space between the concentrator and the transformer Maximum humidity 90 non condensing The CFO 521 support bracket...

Page 12: ...installed apply the protection bracket using the M4 screws supplied FO OPTICAL FIBRE TEMPERATURE SENSOR DIMENSIONS INSTALLATION READING POINT ST CONNECTOR CONNECTION OF THE CONC CFO 521 TO THE FO 935...

Page 13: ...etation of the measured values it is advisable to combine the CH2 probe with the central phase V The CFO 521 concentrator has a Pt100 input RTD class A 3 wire probe for the possible connection of a pr...

Page 14: ...1 Control unit 2 Panel hole dimensions 0 8 mm tolerance 3 Identification label 1 Control unit 3 Fixing screws 2 Fixing blocks 4 Cross head screwdriver 1X100mm FO 935 ASSEMBLY 1 2 3 4 1MN0008 REV 0 Dr...

Page 15: ...ntrol unit 1MN0257 REV 0 1 2 3 INDICATION AUDIBLE AND VISUAL ALARM CONDITION SYSTEM SHUTDOWN Note image relay contacts in non alarm condition except for the FAULT relay which switches contacts 10 11 c...

Page 16: ...the unit before performing any electrical connections eeprom fault concentrator communication bus fault min temperature full scale exceeded max temperature full scale exceeded broken or disconnected f...

Page 17: ...epairs TEMPERATURE DIAGNOSTICS When one of the sensors detects a temperature higher than 1 C with respect to the pre set value as the alarm limit after approximately 5 seconds the ALARM relay switches...

Page 18: ...5 7 Alarm and 8 10 Trip they switch only when the pre set temperature limits are reached or as a result of no voltage on the device FAULT By setting YES Fail safe contact 11 12 is positioned as norma...

Page 19: ...8 The display shows CH4 Enabling CH4 9 Select YES or NO with YES the CH4 is enabled with NO the CH4 is disabled 10 The ALARM threshold for CH4 appears and the Alarm LED flashes If CH4 NO jump to step...

Page 20: ...y TECSYSTEM might not match your requirements Programming the device is the end user s responsibility The settings of the alarm thresholds and enabling of the functions described in this manual must b...

Page 21: ...hose indicated in the paragraph notes for remote programming The ETH module is always in slave mode The FO 935 ETH control unit is in communication with the network only when it is in temperature read...

Page 22: ...and loads the new settings The information RELAY STATUS indicates the state of excitation of the coils of the relays so it will be subject to the commands of FAIL SAFE At the end of the write command...

Page 23: ...see table SYSTEM Setting and Status Value FCD max see table SYSTEM Setting and Status Value 4 20 max see table SYSTEM Setting and Status Voting Value max see table SYSTEM Setting and Status Note If t...

Page 24: ...FREE See Note R 12 00 00 FREE See Note R 13 00 CPU Setting See Notes RW 14 00 CPU Error See Notes R 15 00 Status Relay See Notes R 16 00 00 FREE See Note R 17 00 Address Modbus address 1 255 R 18 00...

Page 25: ...mpl sign 2 compl Ch1 temper 35 C 195 C R 26 2 compl sign 2 compl Ch1 max temperat 0 C 195 C R 27 2 compl sign 2 compl Ch1 temper alarm set point 1 C 190 C AL RW 28 2 compl sign 2 compl Ch1 temper trip...

Page 26: ...emper 35 C 195 C R 38 2 compl sign 2 compl Ch4 max temperat 0 C 195 C R 39 2 compl sign 2 compl Ch4 temper alarm set point 1 C 190 C AL RW 40 2 compl sign 2 compl Ch4 temper trip set point 1 C 190 C T...

Page 27: ...00 Ch4 Setting See Notes CHx RW 61 00 00 R 62 00 00 R 63 00 00 R 64 00 00 R CHANNELS 1 4 Status Address LO 10 Data HI Data LO Notes 1 Notes 2 W write W write W read write 65 Ch1 story Ch1 status See N...

Page 28: ...ATUS CHn STORY BIT 7 BIT 6 BIT 5 BIT 4 BIT 3 BIT 2 BIT 1 BIT 0 TRIP ALARM FLT FOC FCC RELAY STATUS coil energising status BIT 7 BIT 6 BIT 5 BIT 4 BIT 3 BIT 2 BIT 1 BIT 0 FAULT Relay 1 ON TRIP Relay 1...

Page 29: ...et the Ethernet IP parameters 1 START menu Windows If already enabled the program appears 2 Start the search with the Telnet program Press ENTER to launch the program Entering telnet in SEARCH If inst...

Page 30: ...required 9 START menu Windows 10 Search for the Telnet program 15 Enter 192 168 10 120 9999 16 Press ENTER 12 TELNET SCREEN 11 Press ENTER to launch the program 13 Enter OPEN 14 Press ENTER 17 Enter...

Page 31: ...by the operator 2 Communication parameters between the ETH0 port and the control unit 3 Communication configuration between the ETH0 port and the control unit 4 Communication advanced settings between...

Page 32: ...2 Enter the desired new Gateway IP address press ENTER if you wish to keep the set address press ENTER 4 times At the end of the operation the system will ask if you wish to modify Netmask Type in Y t...

Page 33: ...e 27 4 Enter the new Telnet Password 4 digits max press ENTER if you wish to keep the set password press ENTER Type in S to save the modified data Q to exit Telnet without saving the data Indications...

Page 34: ...om normal domestic waste Returning of used electrical appliances contact TECSYSTEM or the TECSYSTEM agent to receive information on correct disposal of the appliances TECSYSTEM is aware of the impact...

Page 35: ...35 FO 935 ETH TECHNICAL INFORMATION ufficiotecnico tecsystem it COMMERCIAL INFORMATION info tecsystem it USEFUL CONTACTS...

Reviews: