ENGLISH
User’s manual
48
ATA Energy Storage System MM
14
Settings
After pressing and holding “ENTER” button for 3 seconds, the unit will enter setting mode. Press “UP” or “DOWN”
button to select setting programs. And then, press “ENTER” button to confirm the selection or “ESC” button to exit.
SETTING
DESCRIPTION
SELECTABLE OPTIONS
00
Exit setting mode
Escape
01
Output source priority:
To configure load power
source priority
Solar first
Solar energy provides power to the
loads as first priority.
If solar energy is not sufficient to
power all connected loads, battery
energy will supply power the loads at
the same time.
Utility provides power to the loads
only when any one condition happens:
- Solar energy is not available
- Battery voltage drops to either low-
level warning voltage or the setting
point in program 12.
Utility first
Utility will provide power to the loads
as first priority.
Solar and battery energy will provide
power to the loads only when utility
power is not available.
SBU priority
(default)
Solar energy provides power to the
loads as first priority.
If solar energy is not sufficient to
power all connected loads, battery
energy will supply power to the loads
at the same time.
Utility provides power to the loads
only when battery voltage drops to
either low-level warning voltage or
the setting point in program 12.
Summary of Contents for ATA 4.0 MM
Page 2: ......
Page 64: ...ENGLISH User s manual 58 ATA Energy Storage System MM...
Page 123: ......
Page 124: ...TECNOWARE s r l www tecnoware com...