ATA Energy Storage System MM
All of Inverters:
When “ALL” is selected, parallel or 3-phase
system will continue working according to
rule of “solar first” setting only when all of
inverters are connected to PV modules.
For example, two units are connected in
parallel and set “SOL” in output source
priority. When selecting “ALL” in program
30, it’s necessary to have all inverters
connected to PV modules and PV input is
normal to allow the system to provide
power to loads from solar and battery
power. Otherwise, the system will provide
power to loads from utility.
12.11
Startup
1.
Before the Startup of the system:
Check all the connections of the Parallel system.
Be sure that the protection systems on the Input LINE connections are open and Input NEUTRAL connections are
connected in common
.
2.
Place the circuit breaker of batteries in “ON” position.
3.
Place the On/Off switch of the 3 ATA units in “ON” position.
LCD Display – ATA L1 phase
LCD Display – ATA L2 phase
LCD Display – ATA L3 phase
4.
Place the circuit breakers of PV panels in “ON” position.
5.
Turn ON all the protections of Input Line. If the AC Three Phase Utility Line is present and ATA units are set
correctly in relation to the phase on which they are placed, the ATA units will operate properly. Otherwise, the icon
will flash and the ATA will not work
.
LCD Display – ATA L1 phase
LCD Display – ATA L2 phase
LCD Display – ATA L3 phase
6.
If no other errors are displayed, the startup procedure of the parallel system is completed.
7.
Finally turn ON the switches of the devices to be powered. The system will power these devices.