23
8 >
026
014
8 >
J u m p i n g t e e t h a p p e a r a n y w h e r e i n
the process of swinging the pendulum
h a m m e r t o t h e l o w e s t p o i n t . I t ’ s
necessary to remove ratchet pawl 026,
and scrape point 8> ② in working
diagram with a knife to ensure the fit
length between ratchet pawl 026 and
ratchet 014 is large enough.
In the swinging pendulum state, the
slinger stops falling before reaching the
lowest point. It needs to remove the 026
ratchet pawl and scrape it with a knife
(026 ratchet claw material is aluminum
alloy, softer). Reduce the mating length
of the 026 ratchet and the 014 ratchet
(normal fit length is 0.8-1.0MM)
2
1
1
2
TECHING
R
Summary of Contents for DM35B
Page 1: ......
Page 2: ...R...
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ...Precautions...
Page 7: ......
Page 9: ......
Page 19: ...10 1 15 Installation of bearing 1 16 Installation of ratchet pawl 041 041 041 042 TECHING R...
Page 21: ...12 047 1 19 Installation of shaft I and gear 1 20 Installation of pulley 021 021 TECHING R...
Page 23: ...14 040 2 3 Installation of bearing 2 4 Installation of shaft cap 045 007 TECHING R...
Page 27: ...18 4 2 Installation of pendulum and swing arm TECHING R...
Page 37: ......
Page 38: ......
Page 39: ...Inspection No...