42
Rail components completed
When installing two linear rails to be butted, make sure to pay
attention to the connection smoothness of these two linear
rails. You can feel it by hand or check it with an object with a
straight edge.
For each set of linear rails, tighten the screws at both ends,
and then arrange the middle three sets of small sleepers
properly to tighten the screws.
092
TECHING
R
Summary of Contents for DM21
Page 1: ......
Page 2: ...3 R...
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ...Precautions...
Page 7: ......
Page 9: ......
Page 18: ...9 095 095 015 014 005 028 3 6 Assemble the driving cab TECHING R...
Page 36: ...27 095 012 095 020 011 The side with the wide notch faces upwards TECHING R...
Page 38: ...29 115 082 079 045 106 TECHING R Lubricant 1 positions...
Page 41: ...32 098 098 TECHING R...
Page 42: ...33 Note Insert 089 into the hole in 056 and then mount the screws below 095 TECHING R...
Page 43: ...34 Flue front cover plate assembly 095 TECHING R...
Page 44: ...35 Front shock absorber assembly 098 TECHING R...
Page 45: ...36 Cab assembly 095 095 TECHING R...
Page 47: ...38 Assembly of two wheeled steam train completed TECHING R...
Page 68: ...59 TECHING R...
Page 69: ......
Page 70: ......
Page 71: ...Inspection No...