41
093
092
Assembly instructions:
1. First put the linear rail into four sets of small sleepers
and
a set of large sleepers. Must hang the hanging platforms
of all the pressure blocks on the linear rails.
2. Then tighten the screws at both ends to ensure that the
linear rails are flush with the small sleepers.
3. Evenly arrange the three small sleepers in the middle
and then tighten the screws.
Hanging platform of
pressure block
TECHING
R
Summary of Contents for DM21
Page 1: ......
Page 2: ...3 R...
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ...Precautions...
Page 7: ......
Page 9: ......
Page 18: ...9 095 095 015 014 005 028 3 6 Assemble the driving cab TECHING R...
Page 36: ...27 095 012 095 020 011 The side with the wide notch faces upwards TECHING R...
Page 38: ...29 115 082 079 045 106 TECHING R Lubricant 1 positions...
Page 41: ...32 098 098 TECHING R...
Page 42: ...33 Note Insert 089 into the hole in 056 and then mount the screws below 095 TECHING R...
Page 43: ...34 Flue front cover plate assembly 095 TECHING R...
Page 44: ...35 Front shock absorber assembly 098 TECHING R...
Page 45: ...36 Cab assembly 095 095 TECHING R...
Page 47: ...38 Assembly of two wheeled steam train completed TECHING R...
Page 68: ...59 TECHING R...
Page 69: ......
Page 70: ......
Page 71: ...Inspection No...