9
GB
Approved installation positions TE1
9
9
9
9
TE1 procedure:
1
Rinse the pipeline thoroughly.
2
Close the shut-off valves in the inlet and outlet.
3
Unscrew the temporary cover or old meter anti-clockwise.
4
Clean the connector's sealing surfaces and the measuring capsule's O-ring.
5
Grease the connector's sealing surfaces lightly with tap grease.
7
Screw the measuring capsule hand-tight into the connector and tighten it by
1
/
8
to
max.
1
/
4
turn with the Techem hook spanner.
8
Turn the computer unit to a position in which it is easily readable.
Approved installation positions IST
9
9
9
2
Steps
1
to
4
and
7
to
8
as for connection geometry TE1.
5
Apply a thin layer of tap grease to the measuring capsule's screw thread and small
O-ring as well as the L-profile seal.
6
Insert L-profile seal in the connector - its flat surface must face upwards.
Summary of Contents for Compact Ve
Page 56: ...56 x x Techem x x 2 x x TAVO TAVO x 4min 6K qi x x EN1434 14154...
Page 57: ...57 BG TE1 9 9 9 9 TE1 1 2 3 4 5 7 Techem 1 8 max 1 4 8 IST 9 9 9 2 1 4 7 8 TE1 5 O L 6 L...
Page 58: ...58 300mm 1 1 2 3 O O 4 5 6 1 2 3 1 2 max 47 cm...
Page 59: ...59 F 1 F 3 F 4 F 5 F 6 C 1 C1 2 1 F4 F1 F6 F3 F9 und F5 x x x x...
Page 62: ...62 x x Techem x x 2 x x TAVO TAVO x 4 6 qi x x 1434 14154...
Page 63: ...63 RU TE1 9 9 9 9 TE1 1 2 3 4 5 7 Techem 1 8 1 4 8 IST 9 9 9 2 1 4 7 8 TE1 5 L 6 L...
Page 64: ...64 300 1 1 2 3 4 5 6 1 2 3 1 2 47...
Page 65: ...65 F 1 F 3 F 4 F 5 F 6 C 1 C1 2 C1 F4 F1 F6 F3 F9 F5 x x x x...
Page 104: ...104...
Page 105: ...105...
Page 106: ...106...
Page 109: ......