
4 - Putting into Operation
Setting up the Balance Kit and the SAG 285/01
Balance Kit Operating Manual, 393278, en, V1.0
4 - 7
4.1.7 Set Communication Protocol and Balance Parameters
Next you must set up the following:
Communications protocol
Balance parameters
Communication
Protocol
The communication protocol can be adapted by means of the three rotary
switches located inside the protocol converter of the LC-RS9 cable (over which
the Control Unit is connected to the computer).
1
Open the cover of the protocol converter.
2
Set the rotary switches (A), (B) and (C) according to the following table.
3
Close the cover.
Balance
Parameters
Next, the balance parameters must be set. For detailed information consult the
Operating Manual of the SAG 285/01.
To set the balance parameters:
1
If not done yet, connect the SAG 285/01 to the mains via the power supply
unit and switch the balance on.
2
Set the balance parameters according to the following table and store them
(except the “Reset” parameter !).
4
Check your settings.
Fig. 4-6
Protocol converter in LC/RS 9
cable
Tab. 4-1
Setting of Communication Protocol
Switch
Set to position
Comment
A
0
Peripheral = Host
B
3
Baudrate = 2400 Baud
C
0
7 bits, even parity
A
B C
D
A
Peripheral selection
B
Baudrate selection
C
Bit/Par/HS selection
D
Cover (opened)
1/10 d
Cal
3
Use the
1/10 d
key of the Control unit to set the
display to 2 decimal places (1/100 g).