background image

RBK-X1 CE

 

PN 2234800-2 / -4 / -6

 

 

    Page 1                                                                                                                           Rev B        Apr 2020 
 

 

RAYCHEM are trademarks of TE Connectivity.

 

 

 
 
 
 

All of the information in this manual, including illustrations, is believed to be reliable. Users, 
however, should independently evaluate the suitability of each product for their application.

 

 

TE Connectivity /Raychem make no warranties as to the accuracy or completeness of the 
information and disclaim any liability regarding its use.

 

 

 

TE Connectivity/Raychem only obligations are those in the Standard Terms and Conditions of Sale 
for this product and in no case will TE Connectivity/Raychem are liable for any incidental, indirect or 
consequential damages arising from the sale, resale, use or misuse of the product.

 

 

 

TE Connectivity/Raychem Specifications are subject to change without notice. In addition, TE 
Connectivity reserve the right to make changes in materials or processing, without notification to 
Buyer, which do not affect compliance with any applicable specification.

 

 
 
 
 
 

 

No part of this manual may be reproduced or transmitted in any form or by any means, electronic or 
mechanical, including photocopying, or recorded by any information storage or retrieval system, 
without written permission from TE.

 

 
 
 
 
 
 
 

 

The original operating manual has been written in English.

 

Summary of Contents for RBK-X1 CE

Page 1: ...1 P a g e 1 111 Page 1 Customer Manual Original Instruction RBK X1 CE Heat Shrink Machine PN 2234800 2 4 6 Operating manual no 409 35017 Language English Rev B...

Page 2: ...his product and in no case will TE Connectivity Raychem are liable for any incidental indirect or consequential damages arising from the sale resale use or misuse of the product TE Connectivity Rayche...

Page 3: ...2 Rev B Apr 2020 Disposal RBK X1 This product must not be disposed of as municipal waste Amendment Record Rev Content Amended By Date Change Request No Rev A Initial Release Cham Zhu Jan 2020 Rev B Up...

Page 4: ...2 3 5 Servicing 12 2 4 Warnings and Labels 13 3 Software 14 3 1 Heat Parameter 16 3 2 Sequence Production 17 3 3 Sequence Setting 18 3 4 Production Setting 19 3 5 Maintenance 20 3 6 Auto Calibration 2...

Page 5: ...ubleshooting Table 36 4 4 Recommended Spare Parts 39 4 5 Repair 42 4 5 1 Circuit Protection Device 42 4 5 2 Gaining Access 43 4 5 3 Heater Element Replacement 45 4 6 Optional Accessories 46 4 6 1 Cali...

Page 6: ...re is within 10 C editable of the set operating temperature Activated by two start buttons the heating chamber moves forward enclosing the joint area It remains in place for the set timed period and t...

Page 7: ...press both buttons to reset the heater to home position and restart the cycle again 4 Dual Release allow removal of splice by hand 5 Grippers hold cable splice in heating chamber 6 Calibration Socket...

Page 8: ...ent PN Display product size or PN stored in the current selected process button 5 Target Setting Display temperature time stored in the current selected process button 6 Current Parameter Display the...

Page 9: ...0V 7 Main Power Switch Used to turn off power to the RBK X1 when in stand by mode 8 Fan Fuse 240V 1A anti surge 9 Heater Fuse 240V DC 3A anti surge 10 Cooling Fan Operates above 190 C heater temperatu...

Page 10: ...any external device to the following outputs below a ferrite core must be clamped to every connection used The ferrite clamp must contain one loop Connection requiring ferrite clamp WITH ONE LOOP 2 A...

Page 11: ...vent the auto retraction of the heater chamber In this event the RBK processor heaters will switch off automatically Follow Heater Carriage Jammed 4 2 9 and the Emergency Heater Chamber Release on 4 2...

Page 12: ...this equipment may be damaged INSULATION RESISTANCE TESTING Do NOT exceed 250V DC protection circuits fitted to this equipment may be damaged Power connections for the Processor must conform to local...

Page 13: ...n when handling finished wiring assemblies immediately after ejection from the heating chamber Special care must be taken when handling the calibration UHI probe immediately after ejection from the he...

Page 14: ...X1 carries a label shown below which displays the product part number PCN product description electrical rating information The following conventions are used in the manual Information to prevent pers...

Page 15: ...ity Input ID and password in this window For example we are trying to log on as Engineer then we should input B in user ID column and input 12345 in Password column Then click on OK button You would f...

Page 16: ...rom main interface Choose the setting item access to below different interface Main Interface Sequence production Heat parameter Production setting Maintenance Sequence setting System Parameter Error...

Page 17: ...edit the parameter 2 Press on the quick button then you would find the original parameter stored in will show on and 3 Click on the value on to input the new value 4 Press on the quick button for 5 s...

Page 18: ...down to 0 4 After finishing the current process 3 the green light will jump to the next process 2 5 When we completed the last process 5 the green light will jump to the first process 3 We already co...

Page 19: ...quick buttons according to the sequence you would like to set 3 2 1 3 5 for example 5 You would find the quick button you selected will show on Currently touch screen can store 15X sequence Each seque...

Page 20: ...here a If you input the value when processor complete the setting production quantity on the main interface will pop up a tip complete to remind the operator production is completed see below capture...

Page 21: ...sor operation cycle after leave factory Can be reset by engineer 5 Heating element timer which is designed to indicate the hours the heating element operate It is required to reset when replaced the h...

Page 22: ...fter the probe has been inserted into the front socket This allows the heating chamber to stabilise 2 Connect the UHI probe to the front panel socket a Touch screen entry Auto Calibration interface au...

Page 23: ...o desired value measured value negative result If above adjust OFST to measured value desired value positive result 5 Wait 25 minutes for temperature to stabilise 6 Repeat 3 and 4 if necessary 7 After...

Page 24: ...ding equipment 2 Switch to allow the the processor to communicate with external device 3 These values are showing the parameter temperature time transferred from external devices 4 These values are sh...

Page 25: ...character received including the SOH the longitudinal addition checksum is maintained up to and including byte 11 Overflow of the checksum beyond a byte boundary is discarded This single byte checksum...

Page 26: ...ton 5 PID control These parameters have to be carefully adjusted together and are factory set Proportional Band Area around the selected process temperature where the output is at a level other than 1...

Page 27: ...e stan by time the machine is in standby mode automatically Press the IO button for 5s to power on the machine Failed to find home position When power on the machine the heating chamber isn t on home...

Page 28: ...chine work well before leaving factory To start the circle test 1 Switch to 2 Edit the test time if need on default value 60 min 3 Press and hold on both start button then test cycle will start 4 When...

Page 29: ...cal regulations 4 1 3 Location RBK X1 is designed to be installed and operated in industrial environments However it should not be used near explosive or flammable materials or in a location where it...

Page 30: ...mber and its stored parameter will be shown on the main interface and they can be used repetitively until another process button is selected 10X process quick buttons 4 2 3 Sequence Production mode Al...

Page 31: ...rect process button is selected for the task required a The active button is shown on the main interface 6 When the Heater Indicator turn green machine is ready to start process Switch OFF 1 Ensure th...

Page 32: ...3 3A and position over splice to be processed 3 Insert the cable splice into the Processor grippers Align the center of the splice and product ends with the guide markers on the Perspex shield and Gua...

Page 33: ...hen the E STOP is activated it will immediately move to the rear and eject the splice being processed Care should be taken in handling the splice as the splice nugget and surrounding area may be hot T...

Page 34: ...onnected to an AC mains electricity supply Before undertaking any maintenance or repair always turn off the equipment and ensure it is isolated from the AC supply Allow machine to cool down before sta...

Page 35: ...actly as if the operator were preparing to switch the machine off The equipment is connected to an AC mains electricity supply Before undertaking any maintenance or repair always turn off the equipmen...

Page 36: ...Check the cooling fan is operating correctly and air is flowing through the rear vent panel 2 Remove front cover Check for correct clearance a minimum of 75mm clear space and obstructions 3 Wire Gripp...

Page 37: ...leshooting Table Problem Possible Cause Verification Solution All LED s OFF No power Unplug mains power cable Check mains supply present Restore power supply Mains Switch not in the ON position and or...

Page 38: ...wiring and connections Adjust sensor position or replace if required Load sensor failed or stuck ON Check sensor gap and position Sensor should be illuminated Check wiring and connections Adjust sens...

Page 39: ...itch off procedure not being observed Switch off at I O switch Fan will continue to run until 190 C and then switch off Blue stand by led will be lit Ensure correct switching procedures are carried ou...

Page 40: ...800 6 CE STD Machine CE STD machine W Welding Interface CE STD machine W Connectivity Package View Window 2234897 1 Start button 2234980 2 Contact Start button 2234984 1 Storage Battery 2234971 1 Each...

Page 41: ...34991 1 See section 4 5 3 how to replace the heating element Thermocouple 2234990 1 Mounting on lower heating element Cooling Fan 2234963 2 Remove the Top cover to replace this Fan Stepper Motor 22348...

Page 42: ...64 1 Locate in Right Cover Safety Relay 2234967 1 Locate in Right Cover Two hand safety control module 2234967 2 Locate in Right Cover Touch Screen 2234977 1 Temperature controller 2234968 1 Locate in...

Page 43: ...ANY REPAIR OR REPLACEMENT THE MACHINE HAS A CAPACITOR AS PART OF THE AUTO RETRACT FEATURE NORMAL PRECAUTIONS REGARDING DISSIPATION OF STORED ENERGY MUST BE TAKEN PRIOR TO ANY SERVICE OR REPAIR AFTER...

Page 44: ...00 2 4 6 Page 43 Rev B Apr 2020 4 5 2 Gaining Access To gain access to the internal components the side and top covers must be removed Use the correct size Key Top Cover Securing Screws 4X Left Cover...

Page 45: ...RBK X1 CE PN 2234800 2 4 6 Page 44 Rev B Apr 2020 Right Cover Securing Screws 7X...

Page 46: ...an be easily removed from cover See picture above in yellow circle 4 Remove the 2X upper heater mounting screws on top of red heating element cover with one hand to hold the heating element avoid fall...

Page 47: ...or PN on TBD item 4 6 1 Calibration tools 288869 000 Standard UHI temperature calibration probe 952687 000 Extension cable 4 6 2 Power Cord Transformer 2234780 1 Power Cord EU Packed in standard machi...

Page 48: ...4800 2 4 6 Page 47 Rev B Apr 2020 4 6 3 Centering Device TBD Centering Device Fixture TBD Software upgrade 4 6 4 Multi wire Fixture 2234710 1 Multi wire Fixture 4 6 5 Stub Splice Fixture 2234801 1 Stu...

Page 49: ...989 1 Schunk SW kit including USB Flash 4 6 8 Barcode Scanner 2234781 1 Barcode Scanner 2234782 1 USB cable Assy 2367220 1 Connectivity package with Scanner 4 6 9 MES Customized TBD hardware TBD Softw...

Page 50: ...depending on wire size and number of wires used Mains Fuses 2 x 240V 3 15A T anti surge Line and Neutral Product Range RBK ILS 125 QSZH Sizes 1 to 3A RBK ILS 85 Sizes 6 1 to 12 3 For other Raychem TE...

Page 51: ...RBK X1 CE PN 2234800 2 4 6 Page 50 Rev B Apr 2020 6 Schematic Diagram...

Page 52: ...RBK X1 CE PN 2234800 2 4 6 Page 51 Rev B Apr 2020...

Page 53: ...RBK X1 CE PN 2234800 2 4 6 Page 52 Rev B Apr 2020...

Page 54: ...Free Trade Zone China GATD Hotline 86 021 33989030 Email TEFE1AP te com 8 RoHS information Information on the presence and location of any substances subject to RoHS Restriction on Hazardous Substance...

Page 55: ...RBK X1 CE PN 2234800 2 4 6 Page 54 Rev B Apr 2020 9 Declaration of conformity of CE...

Reviews: