114-94163-2
Rev C
19 of 20
4.5
End of Line Test /
Endprüfung
Assembled Charge Interfaces have to be tested electrically and mechanically to applicable
requirements, including High Voltage test.
As a minimum following tests have to be performed:
-
Isolation Resistance:
Test Voltage: 500VDC pin-to-pin (all pins, excluding CP-to-PP)
Inspection Duration: 1s
min. Riso: 200MOhm
-
Dielectric withstand voltage:
Test Voltage: 2000VAC pin-to-pin (all pins, excluding CP-to-PP)
Inspection Duration: 1s
max. Leakage current: 10mA
-
Correct Pinning
-
Check seals for correct seating / Check of leakage
-
Gauge check of mating face
-
Functionality of connector locking device (mechanical check of pin movement in locking and
unlocking position)
-
Application of marking (label) according requirements
Alle Ladedosen müssen elektrisch und mechanisch entsprechend den Einsatzanforderungen geprüft
werden, inklusive Hochspannungstest.
Es sind zumindest folgende Prüfungen durchzuführen:
-
Isolationswiderstand:
Prüfspannung: 500VDC von Stift zu Stift (zwischen allen Stiften, außer CP-zu-PP)
Prüfdauer: 1s
min. Isolationswiderstand: 200MOhm
-
Spannungsfestigkeit:
Prüfspannung: 2000VAC von Stift zu Stift (zwischen allen Stiften, außer CP-zu-PP)
Prüfdauer: 1s
max. Leckstrom: 10mA
-
Korrekte Pinbelegung
-
Prüfung der Dichtungen auf korrekten Sitz / Dichtheitsprüfung
-
Lehrenprüfung des Steckgesichtes
-
Funktion der Steckerverriegelungseinheit (mechanische Prüfung der Stift Bewegung in Verriegelungs-
und Entriegelungs-Position)
-
Anforderungskonforme Kennzeichnung (Label) aufbringen