409-35009
Rev E
36 of 44
3. Install the air lines in the matching ports: air line 4 in port 4, air line 5 in port 5, air line 6 in port 6
(Figure 29).
Figure 29: Air lines and ports
1
CPC
2
Port 6
3
Port 4
4
Port 5
4. Install the CPC connector on the CPC.