TCF EVO Line and TCF X Line
Preparations before initial commissioning
Control line connection for TC-HS, TC-HF and TC-Ax
Connect feed hose
In the first step, guide the feed tube through the opening
bordered with a black plastic (see Fig8).
In the second step, push the end of the feed hose with the
downpipe into the downpipe plate
(see Fig6).
Insert downpipe into downpipe plate
Make sure that the downpipe is flush in the downpipe plate
and fasten it with an Allen key (see Fig7).
Summary of Contents for TCF EVO Line
Page 9: ...TCF EVO Line and TCF X Line System overview 9 Abb 2 Structure of the system 4 15 17 16 10 11 ...
Page 102: ...TCF EVO Line and TCF X Line Connection of USB stick to the display 102 ...
Page 119: ...TCF EVO Line and TCF X Line Spare and wear parts 119 14 6Feeding module ...
Page 120: ...TCF EVO Line and TCF X Line Spare and wear parts 120 14 7Guide rail ...
Page 122: ...TCF EVO Line and TCF X Line Spare and wear parts 122 14 8Separation chopper ...
Page 125: ...TCF EVO Line and TCF X Line Spare and wear parts 125 14 9Pneumatics ...
Page 126: ...TCF EVO Line and TCF X Line Spare and wear parts 126 14 10 Sorting pot ...
Page 131: ...TCF EVO Line and TCF X Line Spare and wear parts 131 14 14 Module delivery unit ...
Page 133: ...Original instruction manual ...