background image

2800 Laura Lane • Madison, WI 53562  |  800.836.9044 • fax: 608.836.9044  |  www.tcsbasys.com  

Rev:0617

|

 PRODUCT 

MANUAL

The QWL 3.1 Rev 3 Integrated Building 

Manager Panel contains a Ubiquity Cloud™ 

Site Gateway w/ integrated lighting and 

energy management controls.

QWL 3.1 Rev 3

Integrated Building Manager Panel

Summary of Contents for QWL 3.1 Rev 3

Page 1: ...x 608 836 9044 www tcsbasys com Rev 0617 PRODUCT MANUAL The QWL 3 1 Rev 3 Integrated Building Manager Panel contains a Ubiquity Cloud Site Gateway w integrated lighting and energy management controls...

Page 2: ...METER SEQ100 Utility Pulse Counting Meter for Monitoring of Electric single and 3 phase kW and kWh Gas Water BT LIGHTING CONTROLLER SLQ218 365 day programming for each circuit Analog input for photo...

Page 3: ...y contact digital inputs and 4 pulse meter inputs POWERING THE QWL 3 1 REV 3 SERIES PANEL The QWL 3 1 Rev 3 Series Panel is powered from a 120VAC 60HZ to 12VDC power supply module includ ed The QWL 3...

Page 4: ...wire a 120 terminating resis tor across the A and B terminals at the QWL 3 1 Rev 3 Series Panel See 1 below If the QWL 3 1 Rev 3 Series Panel will be in the middle of the network do not wire in the te...

Page 5: ...ormation in this section click the Update Installation Info button RS 485 Network Port Configuration Configure each of the detected COM ports for this site Typically you will leave Auto Detection of C...

Page 6: ...ng Info button SECURITY INFORMATION This section contains settings which control the security of the gateway within the QWL 3 1 Rev 3 Series Panel and whether or not it can be accessed through the web...

Page 7: ...must be programed using TCS Insight or Ubiquity Cloud CHANNEL EVENT SCHEDULING There are eight independent channels each with its own schedule If the occupied or ON time for a particular day is from...

Page 8: ...ng channels Enable AI2 Threshold checkboxes and enter a threshold and a hysteresis to be used If AI1 is not used the channel power threshold MUST equal the scaling high limit Select whether you want t...

Page 9: ...cal time calculation Next select the channel s that should have the astronom ical time function and click the Enable box This is done in the Schedule section of the page Note For non North American Da...

Page 10: ...CT or on the utility output meter This value is only used for and electric meter P REV The Pulses per revolution for the meter This value is usually provided from the utility company CONSTANT The val...

Page 11: ...e to check and verify all wiring before powering up the QWL 3 1 Rev 3 Series Panel The QWL 3 1 Rev 3 Series Panel is designed to contain 24 VAC devices and wiring ONLY No line voltage 120 VAC or great...

Page 12: ...rify that the power supply nodule included with the QWL 3 1 Rev 3 Series Panel is plugged in to an outlet that has power IF THEN Check that the baud rate set on the controller s are all set the same V...