4

5

WIRING

 

& SETUP

RS-485 Controller Network 
Wiring & Setup

All controls connected to the network must be pro

-

grammed using the same communication baud rate (9600 

baud rate is recommended) as well as a unique communi

-

cation address from 0 to 255, excluding 248. On controllers 

with displays, this is accomplished using the keypad and 

display, or using TCS Insight software, or by calling TCS 

Technical Support . TCS Technical Support can access the 

QWL 3 .1 Rev 3 Series Panel online and change the address 

of a controller .

Use 22 AWG, twisted shielded 3-conductor cable for net

-

work wiring . Network wiring should start at one controller 

and go to the next and then go to the next, and so on until 

the final controller is reached . Wiring is such that all “A” 

wires are connected to “A” wires, all “B” wires are connect

-

ed to “B” wires, and all “REF” wires are connected to “REF” 

wires . 

A 120 Ω terminating resistor should be placed at each of 

the two ends of the network directly across the “A” and 

“B” wires. If the QWL 3.1 Rev 3 Series Panel will be at one 

end of the network, hard wire a 120 Ω terminating resis

-

tor across the “A” and “B” terminals at the QWL 3 .1 Rev 3 

Series Panel (See 1 below).
If the QWL 3.1 Rev 3 Series Panel will be in the middle of 

the network, do not wire in the terminating resistor on the 

QWL 3.1 Rev 3 Series Panel terminal block (See 2 below). 

Finally, connect one end (ideally the furthest end from 

A

B

REF

Shield

A

B

REF

A

B

REF

Earth Ground

Only at one end

Drain

Wire

Last in Daisy Chain

120

 

Terminating

Resistor

...

COM 1

REF

REF

A

A

B

B

Drain

Wire

..

.

120

 

Terminating

Resistor

A
B
REF

A
B
REF

A
B
REF

.

.

.

Last in Daisy Chain

Shield

Last in Daisy Chain

Earth Ground

Only at one end

120

 

Terminating

Resistor

A
B
REF

A
B
REF

A
B
REF

Shield

Drain

Wire

COM 1

REF

REF

A

A

B

B

120

 

Terminating

Resistor

1

2

3

3

4

4

4

To RS-485 port on 

panel board (see 

panel wiring)

The QWL 3 .1 Rev 3 Series Panel at 

end of the network .

The QWL 3 .1 Rev 3 Series Panel in 

the middle of the network .

1

3

2

Shielded, twisted 3-conductor communica

-

tions wiring with one end earth grounded . 

(120 Ω balancing resistors provided.)

Can use up to the total of 64 controllers .  

For more controllers, will need to add 

another QD1010 to the QWL 3 .1 Rev 3 

Series Panel .

4

NOTES:

- If using more than 64 controllers, use 

additional serial ports or additional 

QD1010 adapters .

- Each controller must use the same 

baud rate and be assigned a unique 

address . 

Summary of Contents for QWL 3.1 Rev 3

Page 1: ...x 608 836 9044 www tcsbasys com Rev 0617 PRODUCT MANUAL The QWL 3 1 Rev 3 Integrated Building Manager Panel contains a Ubiquity Cloud Site Gateway w integrated lighting and energy management controls...

Page 2: ...METER SEQ100 Utility Pulse Counting Meter for Monitoring of Electric single and 3 phase kW and kWh Gas Water BT LIGHTING CONTROLLER SLQ218 365 day programming for each circuit Analog input for photo...

Page 3: ...y contact digital inputs and 4 pulse meter inputs POWERING THE QWL 3 1 REV 3 SERIES PANEL The QWL 3 1 Rev 3 Series Panel is powered from a 120VAC 60HZ to 12VDC power supply module includ ed The QWL 3...

Page 4: ...wire a 120 terminating resis tor across the A and B terminals at the QWL 3 1 Rev 3 Series Panel See 1 below If the QWL 3 1 Rev 3 Series Panel will be in the middle of the network do not wire in the te...

Page 5: ...ormation in this section click the Update Installation Info button RS 485 Network Port Configuration Configure each of the detected COM ports for this site Typically you will leave Auto Detection of C...

Page 6: ...ng Info button SECURITY INFORMATION This section contains settings which control the security of the gateway within the QWL 3 1 Rev 3 Series Panel and whether or not it can be accessed through the web...

Page 7: ...must be programed using TCS Insight or Ubiquity Cloud CHANNEL EVENT SCHEDULING There are eight independent channels each with its own schedule If the occupied or ON time for a particular day is from...

Page 8: ...ng channels Enable AI2 Threshold checkboxes and enter a threshold and a hysteresis to be used If AI1 is not used the channel power threshold MUST equal the scaling high limit Select whether you want t...

Page 9: ...cal time calculation Next select the channel s that should have the astronom ical time function and click the Enable box This is done in the Schedule section of the page Note For non North American Da...

Page 10: ...CT or on the utility output meter This value is only used for and electric meter P REV The Pulses per revolution for the meter This value is usually provided from the utility company CONSTANT The val...

Page 11: ...e to check and verify all wiring before powering up the QWL 3 1 Rev 3 Series Panel The QWL 3 1 Rev 3 Series Panel is designed to contain 24 VAC devices and wiring ONLY No line voltage 120 VAC or great...