L2E Repair Document
TCL
Communication Ltd.
Rev.
VFD 700 Level 2 Enhance Repair Document
Page
1.0
31/77
All rights reserved. Transfer, copy, use or communication of this file is prohibited without authorization.
Step6 : Remove the Main and Sub PCBA with plastic flake.