Ludwig-Rinn-Str. 10-14
D - 35452 Heuchelheim
Phone: +49-(0)641-96284-0
Fax: +49-(0)641-96284-28
www.tci.de
Seite 17 von 48
3.32 Mounting UPG with plastering protection
Mounting of the
touch after
plastering
Don’t cover ventilation
slots at the top and
bottom side! Should
the ventilation slots be
covered by the finery
covered, 4 equally
strong distance rings
must be used.