4 Installation, Initial Operation
4
Installation, Initial Operation
4.1
Introduction
In different industrial machining processes, a number of pollutants and particle sizes are generated. A TBH extraction
and filtration system will serve for removing the particles from the place of generation in order to protect e.g. a laser
lens, but also to prevent health hazards of the staff.
Due to the systems' modular construction it becomes possible to adapt the filter equipment to the application case. In
order to provide efficient filtering, leak tightness of filter modules and pipe connections is to be observed already
during installation.
When using a molecular filter (activated carbon filter), its suitability for the application case and regular checks are to
be considered.
4.2
Unpacking
The extraction and filtration system is usually delivered upon a palette and secured with straps and, if necessary, other
fastening elements.
Warning!
Observe the instructions given in chapter Transportation
•
First, place the palette on a flat, suitable plane
•
Loosen the straps and possible other fastening elements
•
Remove the transparent protection film
•
Dependent on device size and filter equipment, the systems are packed in different ways. Smaller devices are
packed in a paperboard container. Larger devices are packed in two paperboard containers.
•
Packaging in one paperboard container:
Carefully open the cardboard box at the top side. Be careful not to damage the system's surface
Turn the device upside down (take care not to damage the surface). Depending on its weight, you should do this
with several people
Pull off the cardboard box and remove the polystyrene parts
Replace the system back on the casters
•
Packaging in double paperboard container:
First, pull off the outside cardboard box
You can now lift the device out of the inside carboard box or cut its edges to push the device out.
Remove the polystyrene parts
•
Caution!
Depending on system size and weight, you should do this with several people
•
Remove the packaging according to the effective regulations
59-236
Summary of Contents for LN Series
Page 2: ...Sprachen Languages Deutsch 3 English 50 Fran aise 97 Espanol 143 Italiano 189 2 236...
Page 48: ...9 Schaltplan 48 236...
Page 49: ...10 Konformit tserkl rung Declaration of conformity 49 236...
Page 95: ...9 Circuit diagram 95 236...
Page 96: ...10 Konformit tserkl rung Declaration of conformity 96 236...
Page 141: ...9 Plan de c blage 141 236...
Page 142: ...10 Konformit tserkl rung Declaration of conformity 142 236...
Page 187: ...9 Esquema de conexiones 187 236...
Page 188: ...10 Konformit tserkl rung Declaration of conformity 188 236...
Page 221: ...7 Ricerca e eliminazione delle anomalie max 4 bar 221 236...
Page 234: ...9 Schema elettrico 234 236...
Page 235: ...10 Konformit tserkl rung Declaration of conformity 235 236...