4 Installation, Initial Operation
FP210-215, FPV200-202, LN600 series, GL20-30,OEN 700 and Extraction cabinett
series:
FP210-215, FPV200-202, LN600 series,OEN 700 series and extraction cabinett are delivered upon the palette without
cardboard box.
•
First, place the palette on a flat, suitable plane
•
Loosen the straps and possible other fastening elements
•
Remove the transparent protection film and carboard containers
•
Carefully lift the system off the palette
•
Necessarily observe correct securing of the system at the load handling device
•
Caution!
Depending on system size and weight, you should do this with several people
•
Remove the packaging according to the effective regulations
Caution!
Do only use original TBH crane eyes, observe enclosed safety
instructions!
4.3
Installation
Warning
: This is a protection class 1 device and must be connected to the protective
earthing conductor. To connect the system to the power supply, you must therefore use the
included power cable or an approved power cable that is identical in construction.
The
power plug must remain accessible.
The filter unit is ready to be plugged in when it is delivered. It may only be connected to the intended voltage (see
nameplate).
Installing the system
•
First, follow the steps described in the “Unpacking” section.
•
Place the device on a clean, flat surface (observe the ambient conditions defined in the “Operation” section).
•
The ambient air must not have too much dust content. Otherwise, the turbine can pollute the air. If in doubt,
contact your local authorities.
•
Secure the device (e.g. pull the wheel brake or for the FP200 series, secure to the ground using the feet at the
bottom); make sure that the system is standing securely especially if there are mounted units with large levers
(e.g.collection elements installed on the system) and install additional fixing/locking devices (floor anchors, or
similar), in case of doubt. In all cases, observe the company regulations at the installation location.
•
The ventilation slots for bypass cooling must not be covered.
•
Connect the remote control line to the interface (see Section 8), if necessary.
•
In the case of devices in the FPV series, the extraction and filter system to be installed downstream must be
correspondingly dimensioned.
•
The filter cartridge systems must be connected to the appropriate compressed air supply.
60-236
Summary of Contents for LN Series
Page 2: ...Sprachen Languages Deutsch 3 English 50 Fran aise 97 Espanol 143 Italiano 189 2 236...
Page 48: ...9 Schaltplan 48 236...
Page 49: ...10 Konformit tserkl rung Declaration of conformity 49 236...
Page 95: ...9 Circuit diagram 95 236...
Page 96: ...10 Konformit tserkl rung Declaration of conformity 96 236...
Page 141: ...9 Plan de c blage 141 236...
Page 142: ...10 Konformit tserkl rung Declaration of conformity 142 236...
Page 187: ...9 Esquema de conexiones 187 236...
Page 188: ...10 Konformit tserkl rung Declaration of conformity 188 236...
Page 221: ...7 Ricerca e eliminazione delle anomalie max 4 bar 221 236...
Page 234: ...9 Schema elettrico 234 236...
Page 235: ...10 Konformit tserkl rung Declaration of conformity 235 236...