Stock No. 1656321 (03 5775)
11
10.
Slide each of the lifting shafts against the inside of the long beam channel.
Weld the lifting shaft to secure the shaft to the long beam as shown in Figure
8. With the shaft secured, slide the lock collars against the hoist lifting tube
and lock them there by tightening the 3/8 set screw. Torque each set screw to
24 ft. lb.