Stock No. 1656321 (03 5775)
10
6.
Cut excess frame off behind the sub-frame rear hinge.
IMPORTANT:
If the truck has fuel tanks located between the chassis frame rails, run
the fillwell spout between the chassis frame rails through one of the sub-frame side
channel knockouts and outside the chassis frame rails for access to refueling the truck. If
an alternate location is needed for the fillwell spout, other than the knockout locations
provided, cut a hole in the sub-frame side rail at the preferred location. Hole must not
exceed 3” in diameter; or disturb the top or bottom flanges of the side rail and must be
completely contained in the web portion of the side rail.
7.
Slide a lock collar onto each lifting shaft. Slide a lifting shaft with collar into
each end of the hoist lifting tube
(Figure 7).
8.
Position the body with the long beams (just long beams if they are separate
from body) onto the sub-frame.
NOTE:
A clearance of at least 2” is required between the truck cab and the closest point
on the truck body.
9.
Position the rear hinge brackets against the bottom side of the long beams.
Once in position, weld the rear hinge brackets to the body long beams as
shown in Figure 8.